48
|
28 Oct 2019 06:28 |
Simone Stracka | Problem | Software | Need python3 package tkinter on DAQ pc | We need python3 package tkinter installed
on ds-proto-daq in order to run the steering
module GUI. |
|
47
|
27 Oct 2019 06:08 |
Simone Stracka | Configuration | Hardware | Converters installed in VME crate | People: Edgar, Simone
Installed differential to single-ended
converters in VME crate, and turned crate |
|
46
|
26 Oct 2019 07:33 |
Sam Hill | Problem | Software | Test of IV Script | People: Simone, Sam, Tom, Edgar
Tested IV curve python script that
runs using MIDAS. Measured resistance consistant |
|
45
|
25 Oct 2019 07:44 |
Simone Stracka | Routine | Hardware | MB2 activities on October 25 | Crew: Edgar Sanchez Garcia, Sam Hill, Simone
Stracka, Tom Thorpe, Yi Wang
|
|
44
|
25 Oct 2019 07:17 |
Simone Stracka | Routine | Hardware | Photoelectronics activities on October, 24 | Crew: Edgar Sanchez Garcia, Sam Hill, Simone
Stracka, Tom Thorpe, Yi Wang
Morning: Tested photocurrents for |
|
43
|
16 Jul 2019 03:53 |
Marco Rescigno | Routine | General | run 774, scintillation events triggering on all 24 channels and 200 us window | Majority of 8, threshold at 1000 ADC count,
24 channels enabled (16 trigger signals)
10 Hz, 200 us window, trigger at 9.5 microseconds. |
|
42
|
16 Jul 2019 03:51 |
Marco Rescigno | Routine | General | run 773, scintillation events triggering on all 24 channels | Majority of 5, threshold at 1000 ADC count,
24 channels enabled (16 trigger signals)
100 Hz, 30 us window. |
|
41
|
16 Jul 2019 03:17 |
Marco Rescigno | Routine | General | run 772, scintillation events triggering on all channels | Majority of 5, threshold at 1000 ADC count,
13 channels enabled (10 trigger signals)
50 Hz, 30 us window. |
|
40
|
16 Jul 2019 02:41 |
Marco Rescigno | Problem | Trigger | Busy handling | This morning tried to get some data with
Vbias=65 V, which seems better for the SiPM
in MB1. |
|
39
|
16 Jul 2019 02:39 |
Marco Rescigno | Routine | General | run 771, scintillation events triggering on ch11 and ch12 of board0 | Trigger setup with a threshold of 1500
ADC count wrt to baseline, on just two channels.
This is also to limit the trigger |
|
38
|
16 Jul 2019 01:58 |
Marco Rescigno | Routine | General | Run 766 (Laser) | Laser Run with Vbias=65 V , new recommended
value from PE group
500 k events acquired |
|
37
|
13 Jul 2019 14:50 |
Marco Rescigno | Routine | General | Long Laser run on disk | Run 747 , 250 k events
as requested by alessandro 40%
post trigger, acquisition window 16 us. |
|
36
|
12 Jul 2019 11:34 |
Marco Rescigno | Routine | General | MB1 test in proto-0 setup/2 Run 718 | Run 718 has 25 channel readout Board 0
ch 0-15 and Board 0 ch 0-7.
Laser triggered, some noise, maybe |
|
35
|
12 Jul 2019 07:58 |
Marco Rescigno | Routine | General | MB1 test in proto-0 setup/day 2 | Implemented a simple charge integration
on the midas display, most of the channels
look almost as good as this one. |
|
34
|
12 Jul 2019 06:01 |
Marco Rescigno | Routine | General | Run 703 | Run 703 is being writte on disk.
16 channels of board 00.
Laser trigger at 10 Hz |
|
33
|
12 Jul 2019 02:05 |
Marco Rescigno | Problem | Trigger | MB1 test in proto-0 setup/1 | Tried to get laser sync signal into chronobox
(clkin1 input), apparently all triggers dropped
by chronobox |
|
32
|
12 Jul 2019 01:27 |
Marco Rescigno | Configuration | | MB1 test in proto-0 setup/1 | Changed custom size to 500 (20 us), tested
ok run 681 |
|
31
|
11 Jul 2019 15:52 |
Thomas | Routine | Trigger | invert first chronobox busy signal | The DAQ seems to be ready for tests with proto-0
tomorrow.
|
|
30
|
02 Jul 2019 18:01 |
Thomas | Routine | Software | MIDAS running again | Darkside people seem to be doing some tests
at CERN next week. It looks like they aren't
going to use our DAQ (they will I think just |
|
29
|
11 Apr 2019 08:20 |
Thomas | Routine | Trigger | Missing ZMQ banks | I have done a couple longer tests of the DAQ
setup. The runs were done with a high trigger
rate of ~60Hz, with
|
|