HW-Time-Slice Firmware-Filter Software vx2740 Steering Module Reports MVM MVM Vexos MVM-Bug listing MVM TRIUMF Local DS Prototype DS Cryogenic For Shifters BCIT-31 ChronoBox Run Operation DS-DAQ
  CERN DS-Proto0 read-only backup  Not logged in ELOG logo
Message ID: 36     Entry time: 12 Jul 2019 11:34
Author: Marco Rescigno 
Type: Routine 
Category: General 
Subject: MB1 test in proto-0 setup/2 Run 718 

Run 718 has 25 channel readout Board 0 ch 0-15 and Board 0 ch 0-7. 

Laser triggered, some noise, maybe not so bad as is look here.

RMS of baseline is 200 ADC count. Single PE peak is about 100-200 ADC count from baseline.

Looking carefully, some very nice scintillation event are found.

 

 

 

 

Attachment 1: RMS_run718.gif  10 kB  Uploaded 12 Jul 2019 21:46  | Hide | Hide all
RMS_run718.gif
Attachment 2: SPE.gif  60 kB  Uploaded 12 Jul 2019 21:46  | Hide | Hide all
SPE.gif
Attachment 3: Scintillation.gif  32 kB  Uploaded 12 Jul 2019 21:47  | Hide | Hide all
Scintillation.gif
ELOG V3.1.4-cb3afcd8