HW-Time-Slice Firmware-Filter Software vx2740 Steering Module Reports MVM MVM Vexos MVM-Bug listing MVM TRIUMF Local DS Prototype DS Cryogenic For Shifters BCIT-31 ChronoBox Run Operation DS-DAQ
  CERN DS-Proto0 read-only backup  Not logged in ELOG logo
Message ID: 45     Entry time: 25 Oct 2019 07:44
Author: Simone Stracka 
Type: Routine 
Category: Hardware 
Subject: MB2 activities on October 25 
Crew: Edgar Sanchez Garcia, Sam Hill, Simone Stracka, Tom Thorpe, Yi Wang

Morning: Set up equipment for the IV curve measurements. We enable the interlock system in the SMU in order to go higher than 42 V (handle with care).

Afternoon:  Measuring IV curves.  Note there is a voltage drop in the LV cable that needs to be compensated for.  

Chan 1 is set at +3.3V drawing 1.46A; sense line reads +2.39V
Chan 2 is set at -3.3V drawing 1.46A; sense line reads -2.39V
IV curves are scanning from 0-80V in 200mV steps w/ 100uA limit: elog:45/2 , elog:45/3
The two runs are visible ( elog:45/1 for color code and mapping )
Compare to elog:45/4 , obtained when probing individual tiles under more controlled light conditions
Attachment 1: TileFEBMapping_MB2.png  146 kB  Uploaded 25 Oct 2019 17:47  | Hide | Hide all
TileFEBMapping_MB2.png
Attachment 2: iv_warm_1.png  177 kB  Uploaded 25 Oct 2019 17:53  | Hide | Hide all
iv_warm_1.png
Attachment 3: iv_warm_1_zoom.png  239 kB  Uploaded 25 Oct 2019 17:53  | Hide | Hide all
iv_warm_1_zoom.png
Attachment 4: IndividualTileAtLNGS.png  145 kB  Uploaded 25 Oct 2019 18:05  | Hide | Hide all
IndividualTileAtLNGS.png
ELOG V3.1.4-cb3afcd8