ID |
Date |
Author |
Type |
Category |
Subject |
Text |
|
90
|
07 Nov 2019 02:07 |
Sam | Routine | General | Run 963 Laser Run with SiPMs at 65V, 12us trace | Laser Intensity: MAX
Threshold: external
clock (laser NIM), laser set to 1kHz |
|
92
|
07 Nov 2019 02:16 |
Sam | Routine | General | Run 964 Laser Run with SiPMs at 65V, 30us trace | Laser Intensity: MAX
Threshold: external
clock (laser NIM), laser set to 1kHz |
|
93
|
07 Nov 2019 02:34 |
Sam | Routine | General | Run 966 Laser Run with SiPMs at 65V, 30us trace | Laser Intensity: MIN
Threshold: external
clock (laser NIM), laser set to 1kHz |
|
111
|
10 Nov 2019 11:19 |
Edgar Sanchez | Routine | General | S1 + S2 short time window | Run 1054
Gas pocket: ON
(unknow) |
|
135
|
15 Nov 2019 10:48 |
E. Sanchez | Routine | General | S1 data taking proposed by Marco | Run 1171
Gas pocket: OFF
Fields: 0 V/cm |
|
108
|
10 Nov 2019 08:04 |
Edgar Sanchez | Routine | General | S1 data taking with field | Run 1032
Gas pocket: OFF
Fields: drift |
|
132
|
14 Nov 2019 07:42 |
E. Sanchez | Routine | General | S1 data taking with field | Run 1148
Gas pocket: OFF
Fields: 500 |
|
109
|
10 Nov 2019 08:40 |
Edgar Sanchez | Routine | General | S1 data taking without field | Run 1041
Gas pocket: OFF
Fields: OFF |
|
130
|
14 Nov 2019 03:51 |
E. Sanchez | Routine | General | S1 data taking without field | Run 1133
Gas pocket: OFF
Fields: OFF |
|
1
|
11 Dec 2018 15:17 |
Thomas | Configuration | Software | Setup elog for ds-proto-daq |
1) Install and tweak elog:
|
|
2
|
11 Dec 2018 15:20 |
Thomas | Configuration | Software | Setup elog for ds-proto-daq |
1) Install and tweak elog:
|
|
18
|
06 Mar 2019 15:10 |
Thomas, Pierre | Routine | Trigger | Setup of chronobox | Summary of setup of chronobox on network (mostly
done by Pierre):
|
|
19
|
06 Mar 2019 18:19 |
Bryerton Shaw | Routine | Trigger | Setup of chronobox | The SDcard is currently required for operation
of the device, the ext3/4 filesystem will
immediately fail upon removal.
|
|
15
|
05 Mar 2019 10:36 |
Thomas | Routine | Digitizer | Switched to standard V1725 firmware | It turns out that the ZLE V1725 firmware we
are using only supports reading out up to
4000 samples per channel.
|
|
24
|
28 Mar 2019 02:18 |
Pierre | Configuration | Trigger | Test | |
|
46
|
26 Oct 2019 07:33 |
Sam Hill | Problem | Software | Test of IV Script | People: Simone, Sam, Tom, Edgar
Tested IV curve python script that
runs using MIDAS. Measured resistance consistant |
|
3
|
13 Dec 2018 11:02 |
Thomas | Routine | Hardware | Testing V1725 digitizers | Couple weeks of work documented in one elog...
V1725 serial numbers: 455, 392, 460, 462, |
|
11
|
07 Feb 2019 17:30 |
Thomas | Routine | Software | Testing the maximum data throughput | First check the maximum trigger rate and maximum
data rate for different sample lengths (for
each channels):
|
|
7
|
21 Jan 2019 13:05 |
Thomas, Pierre | Routine | Digitizer | Tests of V1725 baseline and triggering | A little progress on a couple fronts:
1) We got the baseline DAC setting working |
|
23
|
27 Mar 2019 14:04 |
Pierre | Configuration | Trigger | Time stamp sync | The ChronoBox latest FW is loaded. Let tme
know if this is what the chronobox should
look like in term of registers.
|
|