Message ID: 44     Entry time: 25 Oct 2019 07:17
Author: Simone Stracka 
Type: Routine 
Category: Hardware 
Subject: Photoelectronics activities on October, 24 

Crew: Edgar Sanchez Garcia, Sam Hill, Simone Stracka, Tom Thorpe, Yi Wang

Morning: Tested photocurrents for MB2 on tabletop using SMU and Keithley switching matrix.  All measured between 1-10 microAmps.

Afternoon: Tested PDU mounting procedure with TPC assembled and with the mockup.  No showstoppers. This will be the procedure for installation
With the mockup on the table we double checked the resistances.  Confirmed all values are as before cooling indicating no additional damage to the wire-bondings.

 