HW-Time-Slice
Firmware-Filter
Software
vx2740
Steering Module
Reports
MVM
MVM Vexos
MVM-Bug listing
MVM TRIUMF Local
DS Prototype
DS Cryogenic
For Shifters
BCIT-31
ChronoBox
Run Operation
DS-DAQ
CERN DS-Proto0 read-only backup, Page 7 of 8
Not logged in
Find
|
Config
|
Help
Full
| Summary |
Threaded
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
-- Type --
Routine
Other
148 Entries
Goto page
Previous
1
,
2
,
3
...
6
, 7,
8
Next
All
ID
Date
Author
Type
Category
Subject
Text
28
10 Apr 2019 05:40
Thomas
Routine
General
General work - day 3 at CERN
Several points:
1) Gave a series of tutorial on DAQ to DS
27
08 Apr 2019 08:31
Thomas
Routine
General
General work - day 1 at CERN
Notes on day:
1) Fixed the problem with the network interfaces.
26
03 Apr 2019 15:31
Thomas
Routine
Software
test of elog
The last elog didn't go out cleanly. Modified
the elogd.cfg to point to the proxy. Try
again.
25
03 Apr 2019 15:11
Thomas
Routine
Software
CERN SSO proxy for ds-proto-daq
Pierre and I got the CERN proxy setup for
the Darkside prototype.
24
28 Mar 2019 02:18
Pierre
Configuration
Trigger
Test
23
27 Mar 2019 14:04
Pierre
Configuration
Trigger
Time stamp sync
The ChronoBox latest FW is loaded. Let tme
know if this is what the chronobox should
look like in term of registers.
22
27 Mar 2019 08:57
Pierre
Configuration
Hardware
CERN setup
Found that the Trigger out from the CB is
on output1
Trigger / Not used
21
11 Mar 2019 15:27
Thomas
Routine
Trigger
New chronobox firmware; run start/stop implemented
> f) However, I found that the frontend program
still consistently failed with this error
20
11 Mar 2019 12:30
Thomas
Routine
Trigger
New chronobox firmware; run start/stop implemented
a) Bryerton implemented new version of the
firmware. New features:
19
06 Mar 2019 18:19
Bryerton Shaw
Routine
Trigger
Setup of chronobox
The SDcard is currently required for operation
of the device, the ext3/4 filesystem will
immediately fail upon removal.
18
06 Mar 2019 15:10
Thomas, Pierre
Routine
Trigger
Setup of chronobox
Summary of setup of chronobox on network (mostly
done by Pierre):
17
06 Mar 2019 14:16
Thomas
Routine
General
Retested the chronobox trigger logic
I retested the chronobox trigger generation:
1) Inserting moderate sized pulse into channel
16
05 Mar 2019 14:20
Thomas
Routine
Hardware
Installed network card
I installed a PCIe 1Gbps network card and
configured it as a private network. The
PC (ds-proto-daq) is
15
05 Mar 2019 10:36
Thomas
Routine
Digitizer
Switched to standard V1725 firmware
It turns out that the ZLE V1725 firmware we
are using only supports reading out up to
4000 samples per channel.
14
19 Feb 2019 16:26
Pierre-A.
Configuration
General
Overall HW configuration
For Reference,
I put a simple schematic for the
Trigger/Run control.
13
13 Feb 2019 16:45
Pierre
Problem
Hardware
A3818 from Marco
Checking again Marco's A3818:
- Port #2 (third from top of card) is acting
up.
12
08 Feb 2019 12:08
Thomas
Problem
Hardware
Installed Marco's A3818; didn't work
I installed Marco's A3818 PCIe card. Didn't
seem to work. I got communication errors
talking to link 2. The
11
07 Feb 2019 17:30
Thomas
Routine
Software
Testing the maximum data throughput
First check the maximum trigger rate and maximum
data rate for different sample lengths (for
each channels):
10
06 Feb 2019 14:12
Pierre
Configuration
Hardware
Extended Trigger Time Tag (ETTT)
Confirmed this ETTT configuration is working.
ETTT Enabled [22..21]
9
31 Jan 2019 15:18
Pierre
Configuration
Trigger
Trigger rate
Somehow the trigger rate was not matching
the trigger source.
Find out that Link 3 was not collecting and