HW-Time-Slice
Firmware-Filter
Software
vx2740
Steering Module
Reports
MVM
MVM Vexos
MVM-Bug listing
MVM TRIUMF Local
DS Prototype
DS Cryogenic
For Shifters
BCIT-31
ChronoBox
Run Operation
DS-DAQ
CERN DS-Proto0 read-only backup, Page 6 of 8
Not logged in
Find
|
Config
|
Help
Full
| Summary |
Threaded
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
-- Type --
Routine
Other
148 Entries
Goto page
Previous
1
,
2
,
3
...
5
, 6,
7
,
8
Next
All
ID
Date
Author
Type
Category
Subject
Text
52
28 Oct 2019 15:10
Simone Stracka
Configuration
Hardware
LV for steering module and current status of CAEN mainframe
The HV board from Naples did not turn on:
Yury gave it to the CAEN guys to check and/or
bring back for replacement.
1
11 Dec 2018 15:17
Thomas
Configuration
Software
Setup elog for ds-proto-daq
1) Install and tweak elog:
2
11 Dec 2018 15:20
Thomas
Configuration
Software
Setup elog for ds-proto-daq
1) Install and tweak elog:
3
13 Dec 2018 11:02
Thomas
Routine
Hardware
Testing V1725 digitizers
Couple weeks of work documented in one elog...
V1725 serial numbers: 455, 392, 460, 462,
4
09 Jan 2019 12:22
Thomas
Routine
General
V1725 LVDS outputs
Pierre figured out that NIM crate not working.
We now see LVDS outputs from the individual
channels firing.
5
11 Jan 2019 11:07
Thomas
Routine
Digitizer
Data corruption for ADC channels
I modified the analyzer so that it shows data
from all four modules.
6
17 Jan 2019 15:47
Thomas
Routine
Hardware
Added raided HD to ds-proto-daq
Added pair of 10TB hard-drives in raid-1 to
ds-proto-daq. MIDAS data files will get
written to this raid volume.
11
07 Feb 2019 17:30
Thomas
Routine
Software
Testing the maximum data throughput
First check the maximum trigger rate and maximum
data rate for different sample lengths (for
each channels):
12
08 Feb 2019 12:08
Thomas
Problem
Hardware
Installed Marco's A3818; didn't work
I installed Marco's A3818 PCIe card. Didn't
seem to work. I got communication errors
talking to link 2. The
15
05 Mar 2019 10:36
Thomas
Routine
Digitizer
Switched to standard V1725 firmware
It turns out that the ZLE V1725 firmware we
are using only supports reading out up to
4000 samples per channel.
16
05 Mar 2019 14:20
Thomas
Routine
Hardware
Installed network card
I installed a PCIe 1Gbps network card and
configured it as a private network. The
PC (ds-proto-daq) is
17
06 Mar 2019 14:16
Thomas
Routine
General
Retested the chronobox trigger logic
I retested the chronobox trigger generation:
1) Inserting moderate sized pulse into channel
20
11 Mar 2019 12:30
Thomas
Routine
Trigger
New chronobox firmware; run start/stop implemented
a) Bryerton implemented new version of the
firmware. New features:
21
11 Mar 2019 15:27
Thomas
Routine
Trigger
New chronobox firmware; run start/stop implemented
> f) However, I found that the frontend program
still consistently failed with this error
25
03 Apr 2019 15:11
Thomas
Routine
Software
CERN SSO proxy for ds-proto-daq
Pierre and I got the CERN proxy setup for
the Darkside prototype.
26
03 Apr 2019 15:31
Thomas
Routine
Software
test of elog
The last elog didn't go out cleanly. Modified
the elogd.cfg to point to the proxy. Try
again.
27
08 Apr 2019 08:31
Thomas
Routine
General
General work - day 1 at CERN
Notes on day:
1) Fixed the problem with the network interfaces.
28
10 Apr 2019 05:40
Thomas
Routine
General
General work - day 3 at CERN
Several points:
1) Gave a series of tutorial on DAQ to DS
29
11 Apr 2019 08:20
Thomas
Routine
Trigger
Missing ZMQ banks
I have done a couple longer tests of the DAQ
setup. The runs were done with a high trigger
rate of ~60Hz, with
30
02 Jul 2019 18:01
Thomas
Routine
Software
MIDAS running again
Darkside people seem to be doing some tests
at CERN next week. It looks like they aren't
going to use our DAQ (they will I think just
Goto page
Previous
1
,
2
,
3
...
5
, 6,
7
,
8
Next
All
ELOG V3.1.4-cb3afcd8