HW-Time-Slice Firmware-Filter Software vx2740 Steering Module Reports MVM MVM Vexos MVM-Bug listing MVM TRIUMF Local DS Prototype DS Cryogenic For Shifters BCIT-31 ChronoBox Run Operation DS-DAQ
  CERN DS-Proto0 read-only backup  Not logged in ELOG logo
Message ID: 39     Entry time: 16 Jul 2019 02:39
Author: Marco Rescigno 
Type: Routine 
Category: General 
Subject: run 771, scintillation events triggering on ch11 and ch12 of board0 

Trigger setup with a threshold of 1500 ADC count wrt to baseline, on just two channels.

This is also to limit the trigger to 50 Hz, since the busy still did not work.

100 K events on disk.

ELOG V3.1.4-cb3afcd8