25
|
03 Apr 2019 15:11 |
Thomas | Routine | Software | CERN SSO proxy for ds-proto-daq | Pierre and I got the CERN proxy setup for
the Darkside prototype.
|
|
26
|
03 Apr 2019 15:31 |
Thomas | Routine | Software | test of elog | The last elog didn't go out cleanly. Modified
the elogd.cfg to point to the proxy. Try
again. |
|
27
|
08 Apr 2019 08:31 |
Thomas | Routine | General | General work - day 1 at CERN | Notes on day:
1) Fixed the problem with the network interfaces. |
|
28
|
10 Apr 2019 05:40 |
Thomas | Routine | General | General work - day 3 at CERN | Several points:
1) Gave a series of tutorial on DAQ to DS |
|
29
|
11 Apr 2019 08:20 |
Thomas | Routine | Trigger | Missing ZMQ banks | I have done a couple longer tests of the DAQ
setup. The runs were done with a high trigger
rate of ~60Hz, with
|
|
30
|
02 Jul 2019 18:01 |
Thomas | Routine | Software | MIDAS running again | Darkside people seem to be doing some tests
at CERN next week. It looks like they aren't
going to use our DAQ (they will I think just |
|
31
|
11 Jul 2019 15:52 |
Thomas | Routine | Trigger | invert first chronobox busy signal | The DAQ seems to be ready for tests with proto-0
tomorrow.
|
|
44
|
25 Oct 2019 07:17 |
Simone Stracka | Routine | Hardware | Photoelectronics activities on October, 24 | Crew: Edgar Sanchez Garcia, Sam Hill, Simone
Stracka, Tom Thorpe, Yi Wang
Morning: Tested photocurrents for |
|
45
|
25 Oct 2019 07:44 |
Simone Stracka | Routine | Hardware | MB2 activities on October 25 | Crew: Edgar Sanchez Garcia, Sam Hill, Simone
Stracka, Tom Thorpe, Yi Wang
|
|
47
|
27 Oct 2019 06:08 |
Simone Stracka | Configuration | Hardware | Converters installed in VME crate | People: Edgar, Simone
Installed differential to single-ended
converters in VME crate, and turned crate |
|
48
|
28 Oct 2019 06:28 |
Simone Stracka | Problem | Software | Need python3 package tkinter on DAQ pc | We need python3 package tkinter installed
on ds-proto-daq in order to run the steering
module GUI. |
|
51
|
28 Oct 2019 14:56 |
Simone Stracka | Problem | Software | Issues with network configuration for steering module | We have tried to connect the steering module
to the DAQ pc via Luigi's USB-Ethernet
adapter. |
|
52
|
28 Oct 2019 15:10 |
Simone Stracka | Configuration | Hardware | LV for steering module and current status of CAEN mainframe | The HV board from Naples did not turn on:
Yury gave it to the CAEN guys to check and/or
bring back for replacement. |
|
46
|
26 Oct 2019 07:33 |
Sam Hill | Problem | Software | Test of IV Script | People: Simone, Sam, Tom, Edgar
Tested IV curve python script that
runs using MIDAS. Measured resistance consistant |
|
106
|
09 Nov 2019 09:39 |
Sam Hill | Routine | General | Evening data taking | Run 1016
Gas pocket: ON
(thinkness 7mm) |
|
116
|
11 Nov 2019 09:31 |
Sam Hill | Routine | General | Afternoon system monitoring: IV curves and Dewar refill | 17:30
Took a set of IV curves using 0.5V
steps from 30-50V and 0.05 steps above 50V. |
|
117
|
11 Nov 2019 10:05 |
Sam Hill | Problem | General | Evening data taking | Attemted the following run, and
it started but the rate was shoing 0 and
it got stuck on 5 events |
|
148
|
20 Nov 2019 04:47 |
Sam Hill | Routine | General | IV Curve - warming up | Temp at start:
A: 242.7K B: 278.16K
C: 86.4K D: 240.89K |
|
90
|
07 Nov 2019 02:07 |
Sam | Routine | General | Run 963 Laser Run with SiPMs at 65V, 12us trace | Laser Intensity: MAX
Threshold: external
clock (laser NIM), laser set to 1kHz |
|
92
|
07 Nov 2019 02:16 |
Sam | Routine | General | Run 964 Laser Run with SiPMs at 65V, 30us trace | Laser Intensity: MAX
Threshold: external
clock (laser NIM), laser set to 1kHz |
|