HW-Time-Slice Firmware-Filter Software vx2740 Steering Module Reports MVM MVM Vexos MVM-Bug listing MVM TRIUMF Local DS Prototype DS Cryogenic For Shifters BCIT-31 ChronoBox Run Operation DS-DAQ
  CERN DS-Proto0 read-only backup  Not logged in ELOG logo
Message ID: 116     Entry time: 11 Nov 2019 09:31
Author: Sam Hill 
Type: Routine 
Category: General 
Subject: Afternoon system monitoring: IV curves and Dewar refill 

17:30

Took a set of IV curves using 0.5V steps from 30-50V and 0.05 steps above 50V.

Curves all look as expected, although reducing the step size makes the breakdown voltage harder to see on the plots.

Will use 0.02V steps in future.

Data can be found on dsproto machine at: /home/dsproto/online/dsproto_sy4527/ivdata_191111

Summary plot attached to this entry.

19:15

Refilled outer dewar for 10 mins

Attachment 1: summaryPlot_191111.png  32 kB  Uploaded 11 Nov 2019 18:34  | Hide | Hide all
summaryPlot_191111.png
ELOG V3.1.4-cb3afcd8