HW-Time-Slice
Firmware-Filter
Software
vx2740
Steering Module
Reports
MVM
MVM Vexos
MVM-Bug listing
MVM TRIUMF Local
DS Prototype
DS Cryogenic
For Shifters
BCIT-31
ChronoBox
Run Operation
DS-DAQ
CERN DS-Proto0 read-only backup, Page 2 of 8
Not logged in
Find
|
Config
|
Help
Full
| Summary |
Threaded
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
-- Type --
Routine
Other
148 Entries
Goto page
Previous
1
, 2,
3
...
6
,
7
,
8
Next
All
ID
Date
Author
Type
Category
Subject
Text
139
18 Nov 2019 00:18
Yi / Edgar
Routine
General
dual phase data taking
We still have the noise issue.
Run 1219
Gas pocket: ON
104
09 Nov 2019 00:13
Xiang Xiao
Routine
General
Morning data taking
"ERROR INFO: 10:38:10.924 2019/11/09
[feov1725MTI00,ERROR] [feoV1725.cxx:1048:read_trigger_event,ERROR]
Error: did not receive a ZMQ bank after 100.000000
127
13 Nov 2019 09:24
Xiang Xiao
Routine
General
Evening data taking
Run 1105
Gas pocket: ON
(thinkness 7mm)
151
14 Oct 2020 08:39
Tom Thorpe
Routine
General
Log regarding MB2 removal from Proto-0
Drive folder with data files and some pictures: https://drive.google.com/drive/folders/1Sr27kQTOO2kciBY7v-wYBP06tWLVEjiP
Lab notes @ CERN
11/10/2020
8
28 Jan 2019 01:44
Thoms
Routine
Software
Added web display of V1725 waveforms
I added javascript webdisplay of the V1725
waveforms to the Darkside setup. You can
see the waveform display here:
7
21 Jan 2019 13:05
Thomas, Pierre
Routine
Digitizer
Tests of V1725 baseline and triggering
A little progress on a couple fronts:
1) We got the baseline DAC setting working
18
06 Mar 2019 15:10
Thomas, Pierre
Routine
Trigger
Setup of chronobox
Summary of setup of chronobox on network (mostly
done by Pierre):
1
11 Dec 2018 15:17
Thomas
Configuration
Software
Setup elog for ds-proto-daq
1) Install and tweak elog:
2
11 Dec 2018 15:20
Thomas
Configuration
Software
Setup elog for ds-proto-daq
1) Install and tweak elog:
3
13 Dec 2018 11:02
Thomas
Routine
Hardware
Testing V1725 digitizers
Couple weeks of work documented in one elog...
V1725 serial numbers: 455, 392, 460, 462,
4
09 Jan 2019 12:22
Thomas
Routine
General
V1725 LVDS outputs
Pierre figured out that NIM crate not working.
We now see LVDS outputs from the individual
channels firing.
5
11 Jan 2019 11:07
Thomas
Routine
Digitizer
Data corruption for ADC channels
I modified the analyzer so that it shows data
from all four modules.
6
17 Jan 2019 15:47
Thomas
Routine
Hardware
Added raided HD to ds-proto-daq
Added pair of 10TB hard-drives in raid-1 to
ds-proto-daq. MIDAS data files will get
written to this raid volume.
11
07 Feb 2019 17:30
Thomas
Routine
Software
Testing the maximum data throughput
First check the maximum trigger rate and maximum
data rate for different sample lengths (for
each channels):
12
08 Feb 2019 12:08
Thomas
Problem
Hardware
Installed Marco's A3818; didn't work
I installed Marco's A3818 PCIe card. Didn't
seem to work. I got communication errors
talking to link 2. The
15
05 Mar 2019 10:36
Thomas
Routine
Digitizer
Switched to standard V1725 firmware
It turns out that the ZLE V1725 firmware we
are using only supports reading out up to
4000 samples per channel.
16
05 Mar 2019 14:20
Thomas
Routine
Hardware
Installed network card
I installed a PCIe 1Gbps network card and
configured it as a private network. The
PC (ds-proto-daq) is
17
06 Mar 2019 14:16
Thomas
Routine
General
Retested the chronobox trigger logic
I retested the chronobox trigger generation:
1) Inserting moderate sized pulse into channel
20
11 Mar 2019 12:30
Thomas
Routine
Trigger
New chronobox firmware; run start/stop implemented
a) Bryerton implemented new version of the
firmware. New features:
21
11 Mar 2019 15:27
Thomas
Routine
Trigger
New chronobox firmware; run start/stop implemented
> f) However, I found that the frontend program
still consistently failed with this error