  139   18 Nov 2019 00:18 Yi / EdgarRoutineGeneraldual phase data takingWe still have the noise issue.

Run 1219

Gas pocket: ON
  
  104   09 Nov 2019 00:13 Xiang XiaoRoutineGeneralMorning data taking"ERROR INFO: 10:38:10.924 2019/11/09
[feov1725MTI00,ERROR] [feoV1725.cxx:1048:read_trigger_event,ERROR]
Error: did not receive a ZMQ bank after 100.000000
  
  127   13 Nov 2019 09:24 Xiang XiaoRoutineGeneralEvening data takingRun 1105

Gas pocket: ON
(thinkness 7mm)
  
  151   14 Oct 2020 08:39 Tom ThorpeRoutineGeneralLog regarding MB2 removal from Proto-0Drive folder with data files and some pictures:  https://drive.google.com/drive/folders/1Sr27kQTOO2kciBY7v-wYBP06tWLVEjiP

Lab notes @ CERN

11/10/2020
 forward_warm_1.pngiv_warm_1.pngiv_warm_2.png 
  8   28 Jan 2019 01:44 ThomsRoutineSoftwareAdded web display of V1725 waveformsI added javascript webdisplay of the V1725
waveforms to the Darkside setup.  You can
see the waveform display here:
  
  7   21 Jan 2019 13:05 Thomas, PierreRoutineDigitizerTests of V1725 baseline and triggeringA little progress on a couple fronts:

1) We got the baseline DAC setting working
  
  18   06 Mar 2019 15:10 Thomas, PierreRoutineTriggerSetup of chronoboxSummary of setup of chronobox on network (mostly
done by Pierre):
  
  1   11 Dec 2018 15:17 ThomasConfigurationSoftwareSetup elog for ds-proto-daq
1) Install and tweak elog:
  
  2   11 Dec 2018 15:20 ThomasConfigurationSoftwareSetup elog for ds-proto-daq
1) Install and tweak elog:
  
  3   13 Dec 2018 11:02 ThomasRoutineHardwareTesting V1725 digitizersCouple weeks of work documented in one elog...

V1725 serial numbers: 455, 392, 460, 462,
  
  4   09 Jan 2019 12:22 ThomasRoutineGeneralV1725 LVDS outputsPierre figured out that NIM crate not working.
 We now see LVDS outputs from the individual
channels firing. 
  
  5   11 Jan 2019 11:07 ThomasRoutineDigitizerData corruption for ADC channelsI modified the analyzer so that it shows data
from all four modules.
 dsproto_corrupt.gif 
  6   17 Jan 2019 15:47 ThomasRoutineHardwareAdded raided HD to ds-proto-daqAdded pair of 10TB hard-drives in raid-1 to
ds-proto-daq.  MIDAS data files will get
written to this raid volume.
  
  11   07 Feb 2019 17:30 ThomasRoutineSoftwareTesting the maximum data throughputFirst check the maximum trigger rate and maximum
data rate for different sample lengths (for
each channels):
  
  12   08 Feb 2019 12:08 ThomasProblemHardwareInstalled Marco's A3818; didn't workI installed Marco's A3818 PCIe card.  Didn't
seem to work.  I got communication errors
talking to link 2.  The
  
  15   05 Mar 2019 10:36 ThomasRoutineDigitizerSwitched to standard V1725 firmwareIt turns out that the ZLE V1725 firmware we
are using only supports reading out up to
4000 samples per channel.
  
  16   05 Mar 2019 14:20 ThomasRoutineHardwareInstalled network cardI installed a PCIe 1Gbps network card and
configured it as a private network.  The
PC (ds-proto-daq) is
  
  17   06 Mar 2019 14:16 ThomasRoutineGeneralRetested the chronobox trigger logicI retested the chronobox trigger generation:

1) Inserting moderate sized pulse into channel
  
  20   11 Mar 2019 12:30 ThomasRoutineTriggerNew chronobox firmware; run start/stop implementeda) Bryerton implemented new version of the
firmware.  New features:
  
  21   11 Mar 2019 15:27 ThomasRoutineTriggerNew chronobox firmware; run start/stop implemented
> f) However, I found that the frontend program
still consistently failed with this error
  