HW-Time-Slice Firmware-Filter Software vx2740 Steering Module Reports MVM MVM Vexos MVM-Bug listing MVM TRIUMF Local DS Prototype DS Cryogenic For Shifters BCIT-31 ChronoBox Run Operation DS-DAQ
  CERN DS-Proto0 read-only backup  Not logged in ELOG logo
Message ID: 52     Entry time: 28 Oct 2019 15:10
Author: Simone Stracka 
Type: Configuration 
Category: Hardware 
Subject: LV for steering module and current status of CAEN mainframe 

The HV board from Naples did not turn on: Yury gave it to the CAEN guys to check and/or bring back for replacement.

Yi and Luigi rented a new HV module (A1519). The HV module (A1520P) we used for tests of the I-V script is also present in the Mainframe (see below).
The first 24 channels (slots 0 and 1) are therefore HV. If the new HV does not show up on time we'll try and adapt the cables to work with A1519.

The A2517A module is LV. This is currently operated from the DAQ pc using CAEN_HVPSS_ChannelsController.jnlp (located in the Desktop/SteeringModule folder).
The three low voltage channels (0,1,2) should be turned on at the same time by setting Pw = ON.

Settings: 

Channel 0 and 1: I0Set = 2.0 A , V0Set = 2.5 V ,  UNVThr = 0 V, OVVThr = 3.0 V, Intck = Disabled
IMon = 1.44 (this depends on the illumination) , VMon = 2.48 V , VCon = 2.79 V

Channel 2: I0Set = 1.0 A , V0Set = 5.0 V ,  UNVThr = 0 V, OVVThr = 5.5 V, Intck = Disabled
IMon = 0.07 , VMon = 4.998 V , VCon = 5.02 V

In case the channels trip they cannot be ramped back up unless the alarms are cleared.

 

Attachment 1: CAENmainframe.png  52 kB  Uploaded 29 Oct 2019 00:29  | Hide | Hide all
CAENmainframe.png
ELOG V3.1.4-cb3afcd8