HW-Time-Slice Firmware-Filter Software vx2740 Steering Module Reports MVM MVM Vexos MVM-Bug listing MVM TRIUMF Local DS Prototype DS Cryogenic For Shifters BCIT-31 ChronoBox Run Operation DS-DAQ
  CERN DS-Proto0 read-only backup, Page 6 of 8  Not logged in ELOG logo
Entry  07 Nov 2019 02:07, Sam, Routine, General, Run 963 Laser Run with SiPMs at 65V, 12us trace 
Entry  07 Nov 2019 02:16, Sam, Routine, General, Run 964 Laser Run with SiPMs at 65V, 30us trace 
Entry  07 Nov 2019 02:34, Sam, Routine, General, Run 966 Laser Run with SiPMs at 65V, 30us trace 
Entry  10 Nov 2019 11:19, Edgar Sanchez, Routine, General, S1 + S2 short time window  
Entry  15 Nov 2019 10:48, E. Sanchez, Routine, General, S1 data taking proposed by Marco 
Entry  10 Nov 2019 08:04, Edgar Sanchez, Routine, General, S1 data taking with field 
Entry  14 Nov 2019 07:42, E. Sanchez, Routine, General, S1 data taking with field 
Entry  10 Nov 2019 08:40, Edgar Sanchez, Routine, General, S1 data taking without field 
Entry  14 Nov 2019 03:51, E. Sanchez, Routine, General, S1 data taking without field 
Entry  11 Dec 2018 15:17, Thomas, Configuration, Software, Setup elog for ds-proto-daq 
Entry  11 Dec 2018 15:20, Thomas, Configuration, Software, Setup elog for ds-proto-daq 
Entry  06 Mar 2019 15:10, Thomas, Pierre, Routine, Trigger, Setup of chronobox 
    Reply  06 Mar 2019 18:19, Bryerton Shaw, Routine, Trigger, Setup of chronobox 
Entry  05 Mar 2019 10:36, Thomas, Routine, Digitizer, Switched to standard V1725 firmware 
Entry  28 Mar 2019 02:18, Pierre, Configuration, Trigger, Test 
Entry  26 Oct 2019 07:33, Sam Hill, Problem, Software, Test of IV Script IV_curve_29K.png
Entry  13 Dec 2018 11:02, Thomas, Routine, Hardware, Testing V1725 digitizers 
Entry  07 Feb 2019 17:30, Thomas, Routine, Software, Testing the maximum data throughput 
Entry  21 Jan 2019 13:05, Thomas, Pierre, Routine, Digitizer, Tests of V1725 baseline and triggering 
Entry  27 Mar 2019 14:04, Pierre, Configuration, Trigger, Time stamp sync 
ELOG V3.1.4-cb3afcd8