HW-Time-Slice
Firmware-Filter
Software
vx2740
Steering Module
Reports
MVM
MVM Vexos
MVM-Bug listing
MVM TRIUMF Local
DS Prototype
DS Cryogenic
For Shifters
BCIT-31
ChronoBox
Run Operation
DS-DAQ
|
CERN DS-Proto0 read-only backup, Page 6 of 8 |
Not logged in |
|
|
New entries since: | Wed Dec 31 16:00:00 1969 | |
07 Nov 2019 02:07, Sam, Routine, General, Run 963 Laser Run with SiPMs at 65V, 12us trace
|
07 Nov 2019 02:16, Sam, Routine, General, Run 964 Laser Run with SiPMs at 65V, 30us trace
|
07 Nov 2019 02:34, Sam, Routine, General, Run 966 Laser Run with SiPMs at 65V, 30us trace
|
10 Nov 2019 11:19, Edgar Sanchez, Routine, General, S1 + S2 short time window
|
15 Nov 2019 10:48, E. Sanchez, Routine, General, S1 data taking proposed by Marco
|
10 Nov 2019 08:04, Edgar Sanchez, Routine, General, S1 data taking with field
|
14 Nov 2019 07:42, E. Sanchez, Routine, General, S1 data taking with field
|
10 Nov 2019 08:40, Edgar Sanchez, Routine, General, S1 data taking without field
|
14 Nov 2019 03:51, E. Sanchez, Routine, General, S1 data taking without field
|
11 Dec 2018 15:17, Thomas, Configuration, Software, Setup elog for ds-proto-daq
|
11 Dec 2018 15:20, Thomas, Configuration, Software, Setup elog for ds-proto-daq
|
06 Mar 2019 15:10, Thomas, Pierre, Routine, Trigger, Setup of chronobox
|
06 Mar 2019 18:19, Bryerton Shaw, Routine, Trigger, Setup of chronobox
|
05 Mar 2019 10:36, Thomas, Routine, Digitizer, Switched to standard V1725 firmware
|
28 Mar 2019 02:18, Pierre, Configuration, Trigger, Test
|
26 Oct 2019 07:33, Sam Hill, Problem, Software, Test of IV Script
|
13 Dec 2018 11:02, Thomas, Routine, Hardware, Testing V1725 digitizers
|
07 Feb 2019 17:30, Thomas, Routine, Software, Testing the maximum data throughput
|
21 Jan 2019 13:05, Thomas, Pierre, Routine, Digitizer, Tests of V1725 baseline and triggering
|
27 Mar 2019 14:04, Pierre, Configuration, Trigger, Time stamp sync
|
|