ID |
Date |
Author |
Type |
Category |
Subject |
Text |
|
21
|
11 Mar 2019 15:27 |
Thomas | Routine | Trigger | New chronobox firmware; run start/stop implemented |
> f) However, I found that the frontend program
still consistently failed with this error |
|
22
|
27 Mar 2019 08:57 |
Pierre | Configuration | Hardware | CERN setup | Found that the Trigger out from the CB is
on output1
Trigger / Not used
|
|
23
|
27 Mar 2019 14:04 |
Pierre | Configuration | Trigger | Time stamp sync | The ChronoBox latest FW is loaded. Let tme
know if this is what the chronobox should
look like in term of registers.
|
|
24
|
28 Mar 2019 02:18 |
Pierre | Configuration | Trigger | Test | |
|
25
|
03 Apr 2019 15:11 |
Thomas | Routine | Software | CERN SSO proxy for ds-proto-daq | Pierre and I got the CERN proxy setup for
the Darkside prototype.
|
|
26
|
03 Apr 2019 15:31 |
Thomas | Routine | Software | test of elog | The last elog didn't go out cleanly. Modified
the elogd.cfg to point to the proxy. Try
again. |
|
27
|
08 Apr 2019 08:31 |
Thomas | Routine | General | General work - day 1 at CERN | Notes on day:
1) Fixed the problem with the network interfaces. |
|
28
|
10 Apr 2019 05:40 |
Thomas | Routine | General | General work - day 3 at CERN | Several points:
1) Gave a series of tutorial on DAQ to DS |
|
29
|
11 Apr 2019 08:20 |
Thomas | Routine | Trigger | Missing ZMQ banks | I have done a couple longer tests of the DAQ
setup. The runs were done with a high trigger
rate of ~60Hz, with
|
|
30
|
02 Jul 2019 18:01 |
Thomas | Routine | Software | MIDAS running again | Darkside people seem to be doing some tests
at CERN next week. It looks like they aren't
going to use our DAQ (they will I think just |
|
31
|
11 Jul 2019 15:52 |
Thomas | Routine | Trigger | invert first chronobox busy signal | The DAQ seems to be ready for tests with proto-0
tomorrow.
|
|
32
|
12 Jul 2019 01:27 |
Marco Rescigno | Configuration | | MB1 test in proto-0 setup/1 | Changed custom size to 500 (20 us), tested
ok run 681 |
|
33
|
12 Jul 2019 02:05 |
Marco Rescigno | Problem | Trigger | MB1 test in proto-0 setup/1 | Tried to get laser sync signal into chronobox
(clkin1 input), apparently all triggers dropped
by chronobox |
|
34
|
12 Jul 2019 06:01 |
Marco Rescigno | Routine | General | Run 703 | Run 703 is being writte on disk.
16 channels of board 00.
Laser trigger at 10 Hz |
|
35
|
12 Jul 2019 07:58 |
Marco Rescigno | Routine | General | MB1 test in proto-0 setup/day 2 | Implemented a simple charge integration
on the midas display, most of the channels
look almost as good as this one. |
|
36
|
12 Jul 2019 11:34 |
Marco Rescigno | Routine | General | MB1 test in proto-0 setup/2 Run 718 | Run 718 has 25 channel readout Board 0
ch 0-15 and Board 0 ch 0-7.
Laser triggered, some noise, maybe |
|
37
|
13 Jul 2019 14:50 |
Marco Rescigno | Routine | General | Long Laser run on disk | Run 747 , 250 k events
as requested by alessandro 40%
post trigger, acquisition window 16 us. |
|
38
|
16 Jul 2019 01:58 |
Marco Rescigno | Routine | General | Run 766 (Laser) | Laser Run with Vbias=65 V , new recommended
value from PE group
500 k events acquired |
|
39
|
16 Jul 2019 02:39 |
Marco Rescigno | Routine | General | run 771, scintillation events triggering on ch11 and ch12 of board0 | Trigger setup with a threshold of 1500
ADC count wrt to baseline, on just two channels.
This is also to limit the trigger |
|
40
|
16 Jul 2019 02:41 |
Marco Rescigno | Problem | Trigger | Busy handling | This morning tried to get some data with
Vbias=65 V, which seems better for the SiPM
in MB1. |
|