HW-Time-Slice Firmware-Filter Software vx2740 Steering Module Reports MVM MVM Vexos MVM-Bug listing MVM TRIUMF Local DS Prototype DS Cryogenic For Shifters BCIT-31 ChronoBox Run Operation DS-DAQ
  CERN DS-Proto0 read-only backup, Page 2 of 8  Not logged in ELOG logo
IDup Date Author Type Category Subject Text Attachments
  21   11 Mar 2019 15:27 ThomasRoutineTriggerNew chronobox firmware; run start/stop implemented
> f) However, I found that the frontend program
still consistently failed with this error
  
  22   27 Mar 2019 08:57 PierreConfigurationHardwareCERN setupFound that the Trigger out from the CB is
on output1
Trigger / Not used
  
  23   27 Mar 2019 14:04 PierreConfigurationTriggerTime stamp syncThe ChronoBox latest FW is loaded. Let tme
know if this is what the chronobox should
look like in term of registers.
  
  24   28 Mar 2019 02:18 PierreConfigurationTriggerTest    
  25   03 Apr 2019 15:11 ThomasRoutineSoftwareCERN SSO proxy for ds-proto-daq Pierre and I got the CERN proxy setup for
the Darkside prototype.
  
  26   03 Apr 2019 15:31 ThomasRoutineSoftwaretest of elogThe last elog didn't go out cleanly.  Modified
the elogd.cfg to point to the proxy.  Try
again.
  
  27   08 Apr 2019 08:31 ThomasRoutineGeneralGeneral work - day 1 at CERNNotes on day:

1) Fixed the problem with the network interfaces.
  
  28   10 Apr 2019 05:40 ThomasRoutineGeneralGeneral work - day 3 at CERNSeveral points:

1) Gave a series of tutorial on DAQ to DS
  
  29   11 Apr 2019 08:20 ThomasRoutineTriggerMissing ZMQ banksI have done a couple longer tests of the DAQ
setup.  The runs were done with a high trigger
rate of ~60Hz, with
  
  30   02 Jul 2019 18:01 ThomasRoutineSoftwareMIDAS running againDarkside people seem to be doing some tests
at CERN next week.  It looks like they aren't
going to use our DAQ (they will I think just
  
  31   11 Jul 2019 15:52 ThomasRoutineTriggerinvert first chronobox busy signalThe DAQ seems to be ready for tests with proto-0
tomorrow.  
  
  32   12 Jul 2019 01:27 Marco RescignoConfiguration MB1 test in proto-0 setup/1Changed custom size to 500 (20 us), tested
ok run 681
  
  33   12 Jul 2019 02:05 Marco RescignoProblemTriggerMB1 test in proto-0 setup/1Tried to get laser sync signal into chronobox
(clkin1 input), apparently all triggers dropped
by chronobox
  
  34   12 Jul 2019 06:01 Marco RescignoRoutineGeneralRun 703Run 703 is being writte on disk.

16 channels of board 00. 

Laser trigger at 10 Hz
  
  35   12 Jul 2019 07:58 Marco RescignoRoutineGeneralMB1 test in proto-0 setup/day 2Implemented a simple charge integration
on the midas display, most of the channels
look almost as good as this one.
 Screenshot_from_2019-07-13_17-45-14.png 
  36   12 Jul 2019 11:34 Marco RescignoRoutineGeneralMB1 test in proto-0 setup/2 Run 718Run 718 has 25 channel readout Board 0
ch 0-15 and Board 0 ch 0-7. 

Laser triggered, some noise, maybe
 RMS_run718.gifSPE.gifScintillation.gif 
  37   13 Jul 2019 14:50 Marco RescignoRoutineGeneralLong Laser run on diskRun 747 , 250 k events

as requested by alessandro 40%
post trigger, acquisition window 16 us.
  
  38   16 Jul 2019 01:58 Marco RescignoRoutineGeneralRun 766 (Laser) Laser Run with Vbias=65 V , new recommended
value from PE group

500 k events acquired
  
  39   16 Jul 2019 02:39 Marco RescignoRoutineGeneralrun 771, scintillation events triggering on ch11 and ch12 of board0Trigger setup with a threshold of 1500
ADC count wrt to baseline, on just two channels.

This is also to limit the trigger
  
  40   16 Jul 2019 02:41 Marco RescignoProblemTriggerBusy handlingThis morning tried to get some data with
Vbias=65 V, which seems better for the SiPM
in MB1.
  
ELOG V3.1.4-cb3afcd8