ID |
Date |
Author |
Type |
Category |
Subject |
Text |
|
141
|
18 Nov 2019 03:03 |
Julie / Pascal / Edgar | Routine | General | Random Trigger runs suggested by Simone (4 runs ~ 200 k evts) | Run 1234 Physics run
Chronobox: External
trigger Enable |
|
142
|
18 Nov 2019 07:01 |
Julie / Edgar | Routine | General | Random Trigger runs suggested by Simone, S1 data | PDM 15 and PDM 19 strange behaviour, lot
of noise
Run 1239 Physics run |
|
143
|
18 Nov 2019 07:20 |
Ben Smith | Routine | General | Disk cleanup | Lazy logger has caught up with the backlog,
and continues to transfer new files to darkside01
as they are written.
|
|
144
|
19 Nov 2019 00:14 |
Pascal/Julie | Routine | General | Laser run | Run 1252 Laser run
Chronobox: External
trigger Enable |
|
145
|
19 Nov 2019 00:57 |
Julie/ Pascal | Routine | General | Random Trigger runs suggested by Simone, S1 data / 1ms | Run 1255 Physics run
Chronobox: External
trigger Enable |
|
146
|
19 Nov 2019 01:39 |
Julie / Pascal | Routine | General | Random Trigger runs suggested by Simone, S1 data / 3ms | Run 1258 Physics run
Chronobox: External
trigger Enable |
|
148
|
20 Nov 2019 04:47 |
Sam Hill | Routine | General | IV Curve - warming up | Temp at start:
A: 242.7K B: 278.16K
C: 86.4K D: 240.89K |
|
151
|
14 Oct 2020 08:39 |
Tom Thorpe | Routine | General | Log regarding MB2 removal from Proto-0 | Drive folder with data files and some pictures: https://drive.google.com/drive/folders/1Sr27kQTOO2kciBY7v-wYBP06tWLVEjiP
Lab notes @ CERN
11/10/2020 |
|
3
|
13 Dec 2018 11:02 |
Thomas | Routine | Hardware | Testing V1725 digitizers | Couple weeks of work documented in one elog...
V1725 serial numbers: 455, 392, 460, 462, |
|
6
|
17 Jan 2019 15:47 |
Thomas | Routine | Hardware | Added raided HD to ds-proto-daq | Added pair of 10TB hard-drives in raid-1 to
ds-proto-daq. MIDAS data files will get
written to this raid volume.
|
|
10
|
06 Feb 2019 14:12 |
Pierre | Configuration | Hardware | Extended Trigger Time Tag (ETTT) | Confirmed this ETTT configuration is working.
ETTT Enabled [22..21] |
|
12
|
08 Feb 2019 12:08 |
Thomas | Problem | Hardware | Installed Marco's A3818; didn't work | I installed Marco's A3818 PCIe card. Didn't
seem to work. I got communication errors
talking to link 2. The
|
|
13
|
13 Feb 2019 16:45 |
Pierre | Problem | Hardware | A3818 from Marco | Checking again Marco's A3818:
- Port #2 (third from top of card) is acting
up.
|
|
16
|
05 Mar 2019 14:20 |
Thomas | Routine | Hardware | Installed network card | I installed a PCIe 1Gbps network card and
configured it as a private network. The
PC (ds-proto-daq) is
|
|
22
|
27 Mar 2019 08:57 |
Pierre | Configuration | Hardware | CERN setup | Found that the Trigger out from the CB is
on output1
Trigger / Not used
|
|
44
|
25 Oct 2019 07:17 |
Simone Stracka | Routine | Hardware | Photoelectronics activities on October, 24 | Crew: Edgar Sanchez Garcia, Sam Hill, Simone
Stracka, Tom Thorpe, Yi Wang
Morning: Tested photocurrents for |
|
45
|
25 Oct 2019 07:44 |
Simone Stracka | Routine | Hardware | MB2 activities on October 25 | Crew: Edgar Sanchez Garcia, Sam Hill, Simone
Stracka, Tom Thorpe, Yi Wang
|
|
47
|
27 Oct 2019 06:08 |
Simone Stracka | Configuration | Hardware | Converters installed in VME crate | People: Edgar, Simone
Installed differential to single-ended
converters in VME crate, and turned crate |
|
52
|
28 Oct 2019 15:10 |
Simone Stracka | Configuration | Hardware | LV for steering module and current status of CAEN mainframe | The HV board from Naples did not turn on:
Yury gave it to the CAEN guys to check and/or
bring back for replacement. |
|
55
|
01 Nov 2019 06:50 |
Alex Kish | Configuration | Hardware | Turn off the fields | Ramp down the fields, in 200V steps.
Nominal values:
1st ring: 4180 V
|
|