HW-Time-Slice Firmware-Filter Software vx2740 Steering Module Reports MVM MVM Vexos MVM-Bug listing MVM TRIUMF Local DS Prototype DS Cryogenic For Shifters BCIT-31 ChronoBox Run Operation DS-DAQ
  CERN DS-Proto0 read-only backup, Page 2 of 8  Not logged in ELOG logo
ID Date Author Type Category Subjectdown Text Attachments
  113   11 Nov 2019 00:37 Yi WangProblemMIDAScannot connect to rootanaThe connection to rootana is lost.

No data taking can be started.
  
  119   12 Nov 2019 00:16 Yi WangProblemDigitizerV1725 error, runs keep crashing09:15:33.955 2019/11/12 [feov1725MTI00,ERROR]
[feoV1725.cxx:663:link_thread,ERROR] Exiting
thread 3 with error
  
  120   12 Nov 2019 00:23 Ben SmithProblemDigitizerV1725 error, runs keep crashingIt looks like there's a memory leak in the
high voltage driver, and we were running
out of memory (using a lot of swap). That
  
  70   05 Nov 2019 01:22 Ben SmithConfigurationDigitizerV1725 board configThe V1725s have been changed to have board
config 0x50 rather than 0x10. This means
that they will now trigger on the leading
  
  4   09 Jan 2019 12:22 ThomasRoutineGeneralV1725 LVDS outputsPierre figured out that NIM crate not working.
 We now see LVDS outputs from the individual
channels firing. 
  
  55   01 Nov 2019 06:50 Alex KishConfigurationHardwareTurn off the fieldsRamp down the fields, in 200V steps.
Nominal values:
1st ring: 4180 V
  
  58   01 Nov 2019 09:49 Alex KishConfigurationHardwareTurn off the fieldsRamp UP the fields, in 100V steps.

Nominal values:
  
  9   31 Jan 2019 15:18 PierreConfigurationTriggerTrigger rateSomehow the trigger rate was not matching
the trigger source.
Find out that Link 3 was not collecting and
  
  23   27 Mar 2019 14:04 PierreConfigurationTriggerTime stamp syncThe ChronoBox latest FW is loaded. Let tme
know if this is what the chronobox should
look like in term of registers.
  
  7   21 Jan 2019 13:05 Thomas, PierreRoutineDigitizerTests of V1725 baseline and triggeringA little progress on a couple fronts:

1) We got the baseline DAC setting working
  
  11   07 Feb 2019 17:30 ThomasRoutineSoftwareTesting the maximum data throughputFirst check the maximum trigger rate and maximum
data rate for different sample lengths (for
each channels):
  
  3   13 Dec 2018 11:02 ThomasRoutineHardwareTesting V1725 digitizersCouple weeks of work documented in one elog...

V1725 serial numbers: 455, 392, 460, 462,
  
  46   26 Oct 2019 07:33 Sam HillProblemSoftwareTest of IV ScriptPeople:  Simone, Sam, Tom, Edgar

Tested IV curve python script that
runs using MIDAS. Measured resistance consistant
 IV_curve_29K.png 
  24   28 Mar 2019 02:18 PierreConfigurationTriggerTest    
  15   05 Mar 2019 10:36 ThomasRoutineDigitizerSwitched to standard V1725 firmwareIt turns out that the ZLE V1725 firmware we
are using only supports reading out up to
4000 samples per channel.
  
  18   06 Mar 2019 15:10 Thomas, PierreRoutineTriggerSetup of chronoboxSummary of setup of chronobox on network (mostly
done by Pierre):
  
  19   06 Mar 2019 18:19 Bryerton ShawRoutineTriggerSetup of chronoboxThe SDcard is currently required for operation
of the device, the ext3/4 filesystem will
immediately fail upon removal.
  
  1   11 Dec 2018 15:17 ThomasConfigurationSoftwareSetup elog for ds-proto-daq
1) Install and tweak elog:
  
  2   11 Dec 2018 15:20 ThomasConfigurationSoftwareSetup elog for ds-proto-daq
1) Install and tweak elog:
  
  109   10 Nov 2019 08:40 Edgar SanchezRoutineGeneralS1 data taking without fieldRun 1041

Gas pocket: OFF

Fields: OFF
  
ELOG V3.1.4-cb3afcd8