113
|
11 Nov 2019 00:37 |
Yi Wang | Problem | MIDAS | cannot connect to rootana | The connection to rootana is lost.
No data taking can be started. |
|
119
|
12 Nov 2019 00:16 |
Yi Wang | Problem | Digitizer | V1725 error, runs keep crashing | 09:15:33.955 2019/11/12 [feov1725MTI00,ERROR]
[feoV1725.cxx:663:link_thread,ERROR] Exiting
thread 3 with error |
|
120
|
12 Nov 2019 00:23 |
Ben Smith | Problem | Digitizer | V1725 error, runs keep crashing | It looks like there's a memory leak in the
high voltage driver, and we were running
out of memory (using a lot of swap). That |
|
70
|
05 Nov 2019 01:22 |
Ben Smith | Configuration | Digitizer | V1725 board config | The V1725s have been changed to have board
config 0x50 rather than 0x10. This means
that they will now trigger on the leading |
|
4
|
09 Jan 2019 12:22 |
Thomas | Routine | General | V1725 LVDS outputs | Pierre figured out that NIM crate not working.
We now see LVDS outputs from the individual
channels firing.
|
|
55
|
01 Nov 2019 06:50 |
Alex Kish | Configuration | Hardware | Turn off the fields | Ramp down the fields, in 200V steps.
Nominal values:
1st ring: 4180 V
|
|
58
|
01 Nov 2019 09:49 |
Alex Kish | Configuration | Hardware | Turn off the fields | Ramp UP the fields, in 100V steps.
Nominal values:
|
|
9
|
31 Jan 2019 15:18 |
Pierre | Configuration | Trigger | Trigger rate | Somehow the trigger rate was not matching
the trigger source.
Find out that Link 3 was not collecting and |
|
23
|
27 Mar 2019 14:04 |
Pierre | Configuration | Trigger | Time stamp sync | The ChronoBox latest FW is loaded. Let tme
know if this is what the chronobox should
look like in term of registers.
|
|
7
|
21 Jan 2019 13:05 |
Thomas, Pierre | Routine | Digitizer | Tests of V1725 baseline and triggering | A little progress on a couple fronts:
1) We got the baseline DAC setting working |
|
11
|
07 Feb 2019 17:30 |
Thomas | Routine | Software | Testing the maximum data throughput | First check the maximum trigger rate and maximum
data rate for different sample lengths (for
each channels):
|
|
3
|
13 Dec 2018 11:02 |
Thomas | Routine | Hardware | Testing V1725 digitizers | Couple weeks of work documented in one elog...
V1725 serial numbers: 455, 392, 460, 462, |
|
46
|
26 Oct 2019 07:33 |
Sam Hill | Problem | Software | Test of IV Script | People: Simone, Sam, Tom, Edgar
Tested IV curve python script that
runs using MIDAS. Measured resistance consistant |
|
24
|
28 Mar 2019 02:18 |
Pierre | Configuration | Trigger | Test | |
|
15
|
05 Mar 2019 10:36 |
Thomas | Routine | Digitizer | Switched to standard V1725 firmware | It turns out that the ZLE V1725 firmware we
are using only supports reading out up to
4000 samples per channel.
|
|
18
|
06 Mar 2019 15:10 |
Thomas, Pierre | Routine | Trigger | Setup of chronobox | Summary of setup of chronobox on network (mostly
done by Pierre):
|
|
19
|
06 Mar 2019 18:19 |
Bryerton Shaw | Routine | Trigger | Setup of chronobox | The SDcard is currently required for operation
of the device, the ext3/4 filesystem will
immediately fail upon removal.
|
|
1
|
11 Dec 2018 15:17 |
Thomas | Configuration | Software | Setup elog for ds-proto-daq |
1) Install and tweak elog:
|
|
2
|
11 Dec 2018 15:20 |
Thomas | Configuration | Software | Setup elog for ds-proto-daq |
1) Install and tweak elog:
|
|
109
|
10 Nov 2019 08:40 |
Edgar Sanchez | Routine | General | S1 data taking without field | Run 1041
Gas pocket: OFF
Fields: OFF |
|