HW-Time-Slice Firmware-Filter Software vx2740 Steering Module Reports MVM MVM Vexos MVM-Bug listing MVM TRIUMF Local DS Prototype DS Cryogenic For Shifters BCIT-31 ChronoBox Run Operation DS-DAQ
  CERN DS-Proto0 read-only backup, Page 2 of 8  Not logged in ELOG logo
Entry  11 Nov 2019 00:37, Yi Wang, Problem, MIDAS, cannot connect to rootana 
Entry  12 Nov 2019 00:16, Yi Wang, Problem, Digitizer, V1725 error, runs keep crashing 
    Reply  12 Nov 2019 00:23, Ben Smith, Problem, Digitizer, V1725 error, runs keep crashing 
Entry  05 Nov 2019 01:22, Ben Smith, Configuration, Digitizer, V1725 board config 
Entry  09 Jan 2019 12:22, Thomas, Routine, General, V1725 LVDS outputs 
Entry  01 Nov 2019 06:50, Alex Kish, Configuration, Hardware, Turn off the fields 
Entry  01 Nov 2019 09:49, Alex Kish, Configuration, Hardware, Turn off the fields 
Entry  31 Jan 2019 15:18, Pierre, Configuration, Trigger, Trigger rate 
Entry  27 Mar 2019 14:04, Pierre, Configuration, Trigger, Time stamp sync 
Entry  21 Jan 2019 13:05, Thomas, Pierre, Routine, Digitizer, Tests of V1725 baseline and triggering 
Entry  07 Feb 2019 17:30, Thomas, Routine, Software, Testing the maximum data throughput 
Entry  13 Dec 2018 11:02, Thomas, Routine, Hardware, Testing V1725 digitizers 
Entry  26 Oct 2019 07:33, Sam Hill, Problem, Software, Test of IV Script IV_curve_29K.png
Entry  28 Mar 2019 02:18, Pierre, Configuration, Trigger, Test 
Entry  05 Mar 2019 10:36, Thomas, Routine, Digitizer, Switched to standard V1725 firmware 
Entry  06 Mar 2019 15:10, Thomas, Pierre, Routine, Trigger, Setup of chronobox 
    Reply  06 Mar 2019 18:19, Bryerton Shaw, Routine, Trigger, Setup of chronobox 
Entry  11 Dec 2018 15:17, Thomas, Configuration, Software, Setup elog for ds-proto-daq 
Entry  11 Dec 2018 15:20, Thomas, Configuration, Software, Setup elog for ds-proto-daq 
Entry  10 Nov 2019 08:40, Edgar Sanchez, Routine, General, S1 data taking without field 
ELOG V3.1.4-cb3afcd8