HW-Time-Slice Firmware-Filter Software vx2740 Steering Module Reports MVM MVM Vexos MVM-Bug listing MVM TRIUMF Local DS Prototype DS Cryogenic For Shifters BCIT-31 ChronoBox Run Operation DS-DAQ
  CERN DS-Proto0 read-only backup, Page 3 of 8  Not logged in ELOG logo
ID Date Author Type Category Subject
  111   10 Nov 2019 11:19 Edgar SanchezRoutineGeneralS1 + S2 short time window

Run 1054

Gas pocket: ON (unknow)

Fields: drift 500 V/cm, extraction 3.78 kV/cm

Threshold: 100 ADC below baseline

Trace length: 30us total, 5 us pre-trigger

Threshold extend:  5x16 = 80ns

TPC Pressure:  240 mbarg

SiPM HV: 65 V

Number of events: 50k

Rate: 400 Hz 

 

 

  110   10 Nov 2019 11:18 Edgar SanchezRoutineGeneralAfternoon system monitoring

Run 1050

Gas pocket: ON (unknow)

Fields: drift 200 V/cm, extraction 2.8 kV/cm

Threshold: 1000 ADC below baseline

Trace length: 200us total, 100 us pre-trigger

Threshold extend:  5x16 = 80ns

TPC Pressure:  245 mbarg

SiPM HV: 65 V

Number of events: 10k

Run 1051

Gas pocket: ON (unknow)

Fields: drift 200 V/cm, extraction 3.78 kV/cm

Threshold: 1000 ADC below baseline

Trace length: 200us total, 100 us pre-trigger

Threshold extend:  5x16 = 80ns

TPC Pressure:  260 mbarg

SiPM HV: 65 V

Number of events: 10k

Run 1052

Gas pocket: ON (thinkness 7mm)

Fields: drift 500 V/cm, extraction 3.78 kV/cm

Threshold: 1000 ADC below baseline

Trace length: 200us total, 100 us pre-trigger

Threshold extend:  5x16 = 80ns

TPC Pressure:  245 mbarg

SiPM HV: 65 V

Number of events: 10k

Stopped. Problem with DAQ

  109   10 Nov 2019 08:40 Edgar SanchezRoutineGeneralS1 data taking without field

Run 1041

Gas pocket: OFF

Fields: OFF

Threshold: 100 ADCc below baseline

Trace length: 30us total, 5 us pre-trigger

Threshold extend:  5x16 = 80ns

TPC Pressure:  340 mbarg

SiPM HV: 65 V

Number of events: 50k

Rate: 360 Hz

Run 1042

Gas pocket: OFF

Fields: OFF

Threshold: 200 ADCc below baseline

Trace length: 30us total, 5 us pre-trigger

Threshold extend:  5x16 = 80ns

TPC Pressure:  340 mbarg

SiPM HV: 65 V

Number of events: 50k

Rate: 340 Hz

Run 1043

Gas pocket: OFF

Fields: OFF

Threshold: 250 ADCc below baseline

Trace length: 30us total, 5 us pre-trigger

Threshold extend:  5x16 = 80ns

TPC Pressure:  340 mbarg

SiPM HV: 65 V

Number of events: 50k

Rate: 290 Hz

Run 1044

Gas pocket: OFF

Fields: OFF

Threshold: 400 ADCc below baseline

Trace length: 30us total, 5 us pre-trigger

Threshold extend:  5x16 = 80ns

TPC Pressure:  340 mbarg

SiPM HV: 65 V

Number of events: 50k

Rate: 240 Hz

Run 1045

Gas pocket: OFF

Fields: OFF

Threshold: 600 ADCc below baseline

Trace length: 30us total, 5 us pre-trigger

Threshold extend:  5x16 = 80ns

TPC Pressure:  340 mbarg

SiPM HV: 65 V

Number of events: 50k

Rate: 170 Hz

Run 1046

Gas pocket: OFF

Fields: OFF

Threshold: 800 ADCc below baseline

Trace length: 30us total, 5 us pre-trigger

Threshold extend:  5x16 = 80ns

TPC Pressure:  340 mbarg

SiPM HV: 65 V

Number of events: 50k

Rate:  140 Hz

Run 1047

Gas pocket: OFF

Fields: OFF

Threshold: 1000 ADCc below baseline

Trace length: 30us total, 5 us pre-trigger

Threshold extend:  5x16 = 80ns

TPC Pressure:  340 mbarg

SiPM HV: 65 V

Number of events: 50k

Rate:  110 Hz

Run 1048

Gas pocket: OFF

Fields: OFF

Threshold: 150 ADCc below baseline

Trace length: 30us total, 5 us pre-trigger

Threshold extend:  5x16 = 80ns

TPC Pressure:  340 mbarg

SiPM HV: 65 V

Number of events: 50k

Rate:  400 Hz

Run 1049

Gas pocket: OFF

Fields: OFF

Threshold: 100 ADCc below baseline

Trace length: 30us total, 5 us pre-trigger

Threshold extend:  5x16 = 80ns

TPC Pressure:  340 mbarg

SiPM HV: 65 V

Number of events: 50k

Rate:  400 Hz

  108   10 Nov 2019 08:04 Edgar SanchezRoutineGeneralS1 data taking with field

Run 1032

Gas pocket: OFF

Fields: drift 500 V/cm, extraction 3.78 kV/cm

Threshold: 100 ADCc below baseline

Trace length: 30us total, 5 us pre-trigger

Threshold extend:  5x16 = 80ns

TPC Pressure:  340 mbarg

SiPM HV: 65 V

Number of events: 50k

Rate: 800 Hz

Run 1033

Gas pocket: OFF

Fields: drift 500 V/cm, extraction 3.78 kV/cm

Threshold: 200 ADCc below baseline

Trace length: 30us total, 5 us pre-trigger

Threshold extend:  5x16 = 80ns

TPC Pressure:  340 mbarg

SiPM HV: 65 V

Number of events: 50k

Rate: 350 Hz

Run 1034

Gas pocket: OFF

Fields: drift 500 V/cm, extraction 3.78 kV/cm

Threshold: 250 ADCc below baseline

Trace length: 30us total, 5 us pre-trigger

Threshold extend:  5x16 = 80ns

TPC Pressure:  340 mbarg

SiPM HV: 65 V

Number of events: 50k

Rate: 260 Hz

Run 1035

Gas pocket: OFF

Fields: drift 500 V/cm, extraction 3.78 kV/cm

Threshold: 400 ADCc below baseline

Trace length: 30us total, 5 us pre-trigger

Threshold extend:  5x16 = 80ns

TPC Pressure:  340 mbarg

SiPM HV: 65 V

Number of events: 50k

Rate: 200 Hz

Run 1036

Gas pocket: OFF

Fields: drift 500 V/cm, extraction 3.78 kV/cm

Threshold: 600 ADCc below baseline

Trace length: 30us total, 5 us pre-trigger

Threshold extend:  5x16 = 80ns

TPC Pressure:  340 mbarg

SiPM HV: 65 V

Number of events: 50k

Rate: 130 Hz

 

"ERROR INFO: 17:19:23.176 2019/11/10 [feov1725MTI00,ERROR] [feoV1725.cxx:1048:read_trigger_event,ERROR] Error: did not receive a ZMQ bank after 100.000000 ms. Stopping run."

Run 1037

Gas pocket: OFF

Fields: drift 500 V/cm, extraction 3.78 kV/cm

Threshold: 800 ADCc below baseline

Trace length: 30us total, 5 us pre-trigger

Threshold extend:  5x16 = 80ns

TPC Pressure:  340 mbarg

SiPM HV: 65 V

Number of events: 50k

Rate:  110 Hz

Run 1038

Gas pocket: OFF

Fields: drift 500 V/cm, extraction 3.78 kV/cm

Threshold: 1000 ADCc below baseline

Trace length: 30us total, 5 us pre-trigger

Threshold extend:  5x16 = 80ns

TPC Pressure:  340 mbarg

SiPM HV: 65 V

Number of events: 50k

Rate:  80 Hz

Run 1039

Gas pocket: OFF

Fields: drift 500 V/cm, extraction 3.78 kV/cm

Threshold: 150 ADCc below baseline

Trace length: 30us total, 5 us pre-trigger

Threshold extend:  5x16 = 80ns

TPC Pressure:  340 mbarg

SiPM HV: 65 V

Number of events: 50k

Rate:  400 Hz

 

  107   10 Nov 2019 00:06 Yi WangRoutineGeneralmorning data taking

Run 1022

Gas pocket: ON (thinkness 7mm)

Fields: drift 500 V/cm, extraction 3.78 kV/cm

Threshold: 1000 ADCc below baseline

Trace length: 200us total, 100 us pre-trigger

Threshold extend:  5x16 = 80ns

TPC Pressure:  159 mbarg

SiPM HV: 65 V

Number of events: 10k

 

Run 1024

Gas pocket: ON (thinkness 7mm)

Fields: drift 200 V/cm, extraction 3.78 kV/cm

Threshold: 1000 ADC below baseline

Trace length: 200us total, 100 us pre-trigger

Threshold extend:  5x16 = 80ns

TPC Pressure:  186 mbarg

SiPM HV: 65 V

Number of events: 10k

 

Run 1025

Gas pocket: ON (thinkness 7mm)

Fields: drift 200 V/cm, extraction 2.8 kV/cm

Threshold: 1000 ADC below baseline

Trace length: 200us total, 100 us pre-trigger

Threshold extend:  5x16 = 80ns

TPC Pressure:  207 mbarg

SiPM HV: 65 V

Number of events: 10k

 

Run 1026

Gas pocket: ON (thinkness 7mm)

Fields: OFF

Threshold: 1000 ADC below baseline

Trace length: 200us total, 100 us pre-trigger

Threshold extend:  5x16 = 80ns

TPC Pressure:  225 mbarg

SiPM HV: 65 V

Number of events: 10k

 

Run 1028 Laser run

Chronobox: External trigger Enable

Chronobox: Enable Channel [ch_enable]: 0x00000000

Laser Intensity: MAX

Threshold: external clock (laser NIM), laser set to 1kHz

Trace length: 12us, 5us pre-trigger

SIPM HV: 65V

Number of events: 100k

 

Run 1029 Laser run

Chronobox: External trigger Enable

Chronobox: Enable Channel [ch_enable]: 0x00000000

Laser Intensity: MIN

Threshold: external clock (laser NIM), laser set to 1kHz

Trace length: 12us, 5us pre-trigger

SIPM HV: 65V

Number of events: 100k

  106   09 Nov 2019 09:39 Sam HillRoutineGeneralEvening data taking

Run 1016

Gas pocket: ON (thinkness 7mm)

Fields: Off

Threshold: 1000 ADC below baseline

Trace length: 200us total, 100 us pre-trigger

Threshold extend:  5x16 = 80ns

TPC Pressure: 201 mbarg

SiPM HV: 65 V

Number of Events: 10K

 

Run 1017

Gas pocket: ON (thinkness 7mm)

Fields:  drift 200 V/cm, extraction 2.8 kV/cm

Threshold: 1000 ADC below baseline

Trace length: 200us total, 100 us pre-trigger

Threshold extend:  5x16 = 80ns

TPC Pressure: 201 mbarg

SiPM HV: 65 V

Number of Events: 10K

 

Run 1018

Gas pocket: ON (thinkness 7mm)

Fields:  drift 200 V/cm, extraction 3.78 kV/cm

Threshold: 1000 ADC below baseline

Trace length: 200us total, 100 us pre-trigger

Threshold extend:  5x16 = 80ns

TPC Pressure: 217 mbarg

SiPM HV: 65 V

Number of Events: 10K

 

Run 1019

Gas pocket: ON (thinkness 7mm)

Fields:  drift 500 V/cm, extraction 3.78 kV/cm

Threshold: 1000 ADC below baseline

Trace length: 200us total, 100 us pre-trigger

Threshold extend:  5x16 = 80ns

TPC Pressure: 240

SiPM HV: 65 V

Number of Events: 10K

 

Run 1020 Laser Run

Chronobox: External trigger Enable

Chronobox: Enable Channel [ch_enable]: 0x00000000

Laser Intensity: MAX

Threshold: external clock (laser NIM), laser set to 1kHz

Trace length: 12us, 5us pre-trigger

SIPM HV: 65V

Comment: Recieved this error message but run seemed to continue ok and data appeared to be written: 19:56:04.839 2019/11/09 [feov1725MTI00,ERROR] [feoV1725.cxx:1048:read_trigger_event,ERROR] Error: did not receive a ZMQ bank after 100.000000 ms. Stopping run.   â•³

Run 1021 Laser Run

Chronobox: External trigger Enable

Chronobox: Enable Channel [ch_enable]: 0x00000000

Laser Intensity: MIN

Threshold: external clock (laser NIM), laser set to 1kHz

Trace length: 12us, 5us pre-trigger

SIPM HV: 65V

 

 

 

  105   09 Nov 2019 07:29 Marco RescignoProblem FixedMIDASthis morning problem

frontend process still alive but slow, causing lot of rejected triggers.

stopped and restarted the feov1725 process to fix this

  104   09 Nov 2019 00:13 Xiang XiaoRoutineGeneralMorning data taking

"ERROR INFO: 10:38:10.924 2019/11/09 [feov1725MTI00,ERROR] [feoV1725.cxx:1048:read_trigger_event,ERROR] Error: did not receive a ZMQ bank after 100.000000 ms. Stopping run."

Emailed to Ben.

 

Run 999

Gas pocket: ON (thinkness 7mm)

Fields: drift 200 V/cm, extraction 2.8 kV/cm

Threshold: 1000 ADC below baseline

Trace length: 200us total, 100 us pre-trigger

Threshold extend:  5x16 = 80ns

TPC Pressure:  233 mbarg

SiPM HV: 65 V

Number of events: 10k

 

Run 1000

Gas pocket: ON (thinkness 7mm)

Fields: drift 200 V/cm, extraction 3.78 kV/cm

Threshold: 1000 ADC below baseline

Trace length: 200us total, 100 us pre-trigger

Threshold extend:  5x16 = 80ns

TPC Pressure:  235 mbarg

SiPM HV: 65 V

Number of events: 10k

 

Run 1001

Gas pocket: ON (thinkness 7mm)

Fields: drift 500 V/cm, extraction 3.78 kV/cm

Threshold: 1000 ADC below baseline

Trace length: 200us total, 100 us pre-trigger

Threshold extend:  5x16 = 80ns

TPC Pressure:  238 mbarg

SiPM HV: 65 V

Number of events: 10k

 

Run 1002

Gas pocket: ON (thinkness 7mm)

Fields: OFF

Threshold: 1000 ADC below baseline

Trace length: 200us total, 100 us pre-trigger

Threshold extend:  5x16 = 80ns

TPC Pressure:  238 mbarg

SiPM HV: 65 V

Number of events: 10k

 

Run 1003 Laser run (manually stopped)

Chronobox: External trigger Enable

Chronobox: Enable Channel [ch_enable]: 0x00000000

Laser Intensity: MIN

Threshold: external clock (laser NIM), laser set to 1kHz

Trace length: 12us, 5us pre-trigger

SIPM HV: 65V

Comment: Triger rate too low (~8 Hz), manually stopped

 

Run 1004 Laser run (manually stopped)

Chronobox: External trigger Enable

Chronobox: Enable Channel [ch_enable]: 0x00000000

Laser Intensity: MIN

Threshold: external clock (laser NIM), laser set to 1kHz

Trace length: 12us, 5us pre-trigger

SIPM HV: 65V

Comment: Triger rate too low (~8 Hz), manually stopped

 

  103   08 Nov 2019 22:31 Marco ConfigurationHardwareAdding darkside01

Wrong MAC address fixed in CERN network setting, now the machine is visible from external network too:

From CERN network (even laptop) can connect by 

ssh -XY dsproto@ds-proto-daq2.cern.ch.  (same password as local account in ds-proto-daq)

From ds-proto-daq can also connect by:

ssh darkside01

That is to say that the two network card are now associated to two different names.. but the "real" name is still darkside01.

(will fix).

 enjoy

 

  101   08 Nov 2019 10:07 Edgar SanchezRoutineGeneralMonitoring Data Taking

Run 995

Gas pocket: ON (thinkness 7mm)

Fields: drift 200 V/cm, extraction 2.8 kV/cm

Threshold: 1000 ADC below baseline

Trace length: 200us total, 100 us pre-trigger

Threshold extend:  5x16 = 80ns

TPC Pressure:  230 mbarg

SiPM HV: 65 V

Number of events: 10k

Rate  ~9 Hz

Comment: TPC pressure increased up to 290 mbarg

Run 996

Gas pocket: ON (thinkness 7mm)

Fields: drift 200 V/cm, extraction 3.78 kV/cm

Threshold: 1000 ADC below baseline

Trace length: 200us total, 100 us pre-trigger

Threshold extend:  5x16 = 80ns

TPC Pressure:  225 mbarg

SiPM HV: 65 V

Number of events: 10k

Rate  ~9 Hz

Comment: TPC pressure increased up to 240 mbarg

Run 997

Gas pocket: ON (thinkness 7mm)

Fields: drift 500 V/cm, extraction 3.78 kV/cm

Threshold: 1000 ADC below baseline

Trace length: 200us total, 100 us pre-trigger

Threshold extend:  5x16 = 80ns

TPC Pressure:  240 mbarg

SiPM HV: 65 V

Number of events: 10k

Rate  ~9 Hz

Run 998

Gas pocket: ON (thinkness 7mm)

Fields: OFF

Threshold: 1000 ADC below baseline

Trace length: 200us total, 100 us pre-trigger

Threshold extend:  5x16 = 80ns

TPC Pressure:  240 mbarg

SiPM HV: 65 V

Number of events: 10k

Rate  ~9 Hz

  100   08 Nov 2019 09:09 Ben SmithConfigurationHardwareAdding darkside01 to the network
The cable has been fixed. Socket 0001/007 is still not active.
  99   08 Nov 2019 08:35 Ben SmithConfigurationHardwareFailed to talk to steering module from DAQ PC
I have failed to communicate with the steering module arduino from the DAQ PC.

The steering module has the most bizarre communication protocol of any device I have used:
* it has a static IP address (192.168.121.2)
* if something connects and sends a command, it doesn't send a response to that device - it sends responses to a different static IP address on a fixed port
* before a device connects, it's ethernet port is not open all the time - it turns it on for a brief period, and if something connects during that period, it remains on; if not, it turns off for a while. I'd estimate something like on for 500ms, off for 500ms.

We are currently using a macbook to connect to the steering module. The macbook is statically assigned IP address 192.168.121.1. When pinging the steering module, then first few pings fail with "no route to host". Eventually one of the pings coincides with the steering module having its ethernet on, and then the steering module keeps its ethernet on and the rest of the pings succeed.

We bought a new NIC for DAQ machine. I assigned it same static IP address (192.168.121.1), added a hole in the firewall (and even tried turning the firewall off for a bit), ensured the correct interface was used for connections to 192.168.121.0/24, but we never get a route to the steering module.

I have run out of things to try (but I may have missed something). My hypothesis is that linux isn't able to negotiate a connection quickly enough, but I may be wrong. It is my last evening at CERN, so I have returned the steering module to be connected to the macbook. Shifters will continue to have to manually change channels rather than having it automated by midas.

I hope that future versions of the steering module will have a more normal network protocol - open a server socket (static if must be, but preferably on DHCP), wait for connections, reply to commands on that same connection.
  98   08 Nov 2019 05:14 Ben SmithConfigurationHardwareAdding darkside01 to the network
The analysis server from Roma (darkside01) is now connected to the local network. It is not yet connected to CERN.

There are 2 network ports on the rear of the machine:
* The port labelled "1":
 * MAC: 9c:71:3a:22:d5:62
 * Name: enp2s0f0
 * Configured for DHCP
 * Connected to local switch
 * Assigned IP 192.168.1.10 by ds-proto-daq
* The port labelled "2":
 * MAC: 9c:71:3a:22:d5:63
 * Name: enp2s0f1
 * Configured for DHCP
 * Should be connected to CERN network

I have set up password-less ssh between ds-proto-daq and darkside01. 

There are 3 problems connecting to the CERN network:
1) The long cable that was created does not work. I tried using it to connect ds-proto-daq to socket 0001/06 (i.e. the socket ds-proto-daq is normally connected to) and there is no link light - the cable is broken.
2) Socket 0001/07 does not seem to be operational. I tried connecting ds-proto-daq to socket 0001/07 using the cable we know works, and there was no link light. Either CERN have disabled the connection intentionally, or it is broken.
3) When I used the good cable to connect to the good socket (0001/06), CERN claimed the machine was unregistered. Marco told me that the interfaces have MACs 9c:71:3a:22:d6:4[ab] (rather than 9c:71:3a:22:d5:6[23]), so presumably the wrong MAC addresses were registered with CERN.

So, we need to register the correct MACs, fix the cable, and either get 0001/07 working or connect to a different socket.
  97   08 Nov 2019 02:48 Ben SmithConfigurationMIDASEnabled dotfile naming in Logger
I have changed `/Logger/Channels/0/Settings/Filename` to start with a dot, so files will be hidden until they are complete. 
The current value is `.run%05dsub%03d.mid`.

This will help Pablo with his script for transferring files to EOS.
  96   08 Nov 2019 02:31 Ben SmithRoutineSoftwareNew "run type" selection page
I made a new page that makes it easier to switch between laser/noise/physics runs. 

It handles setting the most common chronobox trigger settings, and the V1725 self-trigger thresholds. 
For the latter, it assumes that the baselines are at 15500. A suggested workflow would be to run
"equalize_baselines.py" in the morning to ensure all channels are at 15500, then you can use this
page to set the self-trigger thresholds for the rest of the day/week without using the python scripts.

The page is available at https://m-darkside.web.cern.ch/?cmd=custom&page=Run%20type
  95   08 Nov 2019 02:21 Ben SmithProblem FixedSoftwareIncreased max waveform length that we can take
I've increased various thresholds so that we can now take 3000us (3ms) waveforms.

The changes are:
* /Experiment/MAX_EVENT_SIZE in ODB is now 50,000,000
* /Experiment/Buffer sizes/SYSTEM in ODB is now 500,000,000
* max_event_size for V1725 frontend is now 45,000,000 (we use this in several places, so I now have `#define V1725_MAX_EVENT_SIZE 45000000` in v1725CONET2.hxx)
* event_buffer_size for V1725 frontend is now big enough for 10 of these largest events

The main data-taking works smoothly with 3ms traces, albeit at a low event rate. 

However protoDisplay segfaults after a few events. The backtrace is random each time, so we're clearly overflowing a buffer somewhere. I will try to look into it, but it will probably be painful and I don't think it's the highest priority issue to fix (it works "fine" for the usual 200us waveforms).
  94   07 Nov 2019 23:48 Yi WangRoutineGeneralmorning data taking

Run 973

Gas pocket: ON (thinkness 7mm)

Fields: drift 200 V/cm, extraction 3.78 kV/cm

Threshold: 1000 ADC below baseline

Trace length: 200us total, 100 us pre-trigger

Threshold extend:  5x16 = 80ns

TPC Pressure:  222 mbarg

SiPM HV: 65 V

Number of events: 10k

 

Run 974

Gas pocket: ON (thinkness 7mm)

Fields: drift 500 V/cm, extraction 3.78 kV/cm

Threshold: 1000 ADC below baseline

Trace length: 200us total, 100 us pre-trigger

Threshold extend:  5x16 = 80ns

TPC Pressure:  222 mbarg

SiPM HV: 65 V

Number of events: 10k

 

Run 975

Gas pocket: ON (thinkness 7mm)

Fields: drift 200 V/cm, extraction 2.8 kV/cm

Threshold: 1000 ADC below baseline

Trace length: 200us total, 100 us pre-trigger

Threshold extend:  5x16 = 80ns

TPC Pressure:  222 mbarg

SiPM HV: 65 V

Number of events: 10k

 

Run 976

Gas pocket: ON (thinkness 7mm)

Fields: OFF

Threshold: 1000 ADC below baseline

Trace length: 200us total, 100 us pre-trigger

Threshold extend:  5x16 = 80ns

TPC Pressure:  222 mbarg

SiPM HV: 65 V

Number of events: 10k

 

Run 978 Laser run

Chronobox: External trigger Enable

Chronobox: Enable Channel [ch_enable]: 0x00000000

Laser Intensity: MAX

Threshold: external clock (laser NIM), laser set to 1kHz

Trace length: 12us, 5us pre-trigger

SIPM HV: 65V

Number of events: 100k

 

Run 979 Laser run

Chronobox: External trigger Enable

Chronobox: Enable Channel [ch_enable]: 0x00000000

Laser Intensity: MIN

Threshold: external clock (laser NIM), laser set to 1kHz

Trace length: 12us, 5us pre-trigger

SIPM HV: 65V

Number of events: 100k

 

After laser run:

Switch Laser OFF

In Chronobox:

DIsable "External Triger Enable [ext_trig_ena]0\[0]

Input "0x3F3F3F7F" in "Enable Channel [ch_enable] 

 

  93   07 Nov 2019 02:34 SamRoutineGeneralRun 966 Laser Run with SiPMs at 65V, 30us trace

Laser Intensity: MIN 

Threshold: external clock (laser NIM), laser set to 1kHz

Trace length: 30us, 5us pre-trigger

SIPM HV: 65V

 

MISSING FILE (E.Sanchez)

  92   07 Nov 2019 02:16 SamRoutineGeneralRun 964 Laser Run with SiPMs at 65V, 30us trace

Laser Intensity: MAX

Threshold: external clock (laser NIM), laser set to 1kHz

Trace length: 30us, 5us pre-trigger

SIPM HV: 65V

  91   07 Nov 2019 02:07 Yi/Marco/AndreaRoutineGeneralmorning data taking, purity check

Run 956

Gas pocket: ON (thickness 7mm)

Fields: drift 200 V/cm, extraction 2.8 kV/cm

Threshold: 1000 ADC below baseline

Trace length: 200us total, 100 us pre-trigger

TPC Pressure: >200 mbarg

SiPM HV: 65 V

Number of events: 10k

 

Run 957

Gas pocket: ON (thickness 7mm)

Fields: drift 200 V/cm, extraction 3.78 kV/cm

Threshold: 1000 ADC below baseline

Trace length: 200us total, 100 us pre-trigger

TPC Pressure: >200 mbarg

SiPM HV: 65 V

Number of events: 10k

 

Run 958

Gas pocket: ON (thickness 7mm)

Fields: drift 500 V/cm, extraction 3.78 kV/cm

Threshold: 1000 ADC below baseline

Trace length: 200us total, 100 us pre-trigger

TPC Pressure: >200 mbarg

SiPM HV: 65 V

Number of events: 10k

 

Run 960

Gas pocket: ON (thickness 7mm)

Fields: drift 500 V/cm, extraction 3.78 kV/cm

Threshold: 200 ADC below baseline

Trace length: 200us total, 100 us pre-trigger

TPC Pressure: >200 mbarg

SiPM HV: 65 V

Number of events: 10k

 

Run 961

Gas pocket: ON (thickness 7mm)

Fields: OFF

Threshold: 1000 ADC below baseline

Trace length: 200us total, 100 us pre-trigger

TPC Pressure: >200 mbarg

SiPM HV: 65 V

Number of events: 10k

ELOG V3.1.4-cb3afcd8