Entry  04 Nov 2019 07:57, Ben Smith, Configuration, Software, Package installations 
This morning I installed the xrootd-client and python3-devel packages from yum. For the latter to work, I needed to do a yum update. This was long overdue,
and updated 1200+ packages.
Entry  04 Nov 2019 06:02, Alex Kish, Configuration, Hardware, Increased fields! 
Increased drift and extraction fields.

Current settings: wire gate 5100 V, 1st ring: 6100 V, cathode: 11100 V
Entry  03 Nov 2019 09:17, Alex Kish, Routine, General, run 836, zero drift field 
Gas pocket: ON

Fields: drift field OFF (1st ring 0 V, cathode 0 V), extraction field OFF (wire gate 0 V)

Threshold: 200 ADCc below baseline
Entry  03 Nov 2019 08:49, Alex Kish, Routine, General, run 835, zero drift field 
Gas pocket: ON

Fields: drift field OFF (1st ring 0 V, cathode 0 V), extraction field OFF (wire gate 0 V)

Threshold: 200 ADCc below baseline
Entry  03 Nov 2019 08:15, Alex Kish, Routine, General, run 834, drift field ON, extraction OFF 
Gas pocket: ON

Fields: drift field ON (1st ring 4180 V, cathode 6180 V), extraction field OFF (wire gate 0 V)

Threshold: 200 ADCc below baseline
Entry  03 Nov 2019 07:46, Alex Kish, Routine, General, run 833, with nominal fields 
Gas pocket: ON

Fields: ON (wire gate 3780 V, 1st ring 4180 V, cathode 6180 V)

Threshold: 200 ADCc below baseline
Entry  01 Nov 2019 10:56, Alex / Marco, Routine, General, run 829, with nominal fields 
Gas pocket: ON

Fields: ON

Threshold: 200 ADCc below baseline
Entry  01 Nov 2019 09:49, Alex Kish, Configuration, Hardware, Turn off the fields 
Ramp UP the fields, in 100V steps.

Nominal values:
Entry  01 Nov 2019 09:06, Alex Kish, Routine, General, run 826, zero-field with gas pocket 
Gas pocket: ON

Fields: OFF

Threshold: 400 ADCc below baseline
Entry  01 Nov 2019 06:50, Alex Kish, Configuration, Hardware, Turn off the fields 
Ramp down the fields, in 200V steps.
Nominal values:
1st ring: 4180 V
Entry  01 Nov 2019 06:15, Ben Smith, Problem Fixed, Software, Restoration of elog 
After booting, the elog was only showing logs from before July, and was missing the "For Shifters" category. It appears we were loading the incorrect config
file. The running command was:
Entry  01 Nov 2019 06:07, Ben Smith, Problem Fixed, Software, Restoration of network settings 
For a few days we were unable to access ds-proto-daq remotely. We were also unable to reach the outside world from ds-proto-daq.

To gain more control over the network settings, I have disabled the automatic configuration by dracut. I created the file /etc/dracut.conf.d/no-ifcfg.conf
Entry  28 Oct 2019 15:10, Simone Stracka, Configuration, Hardware, LV for steering module and current status of CAEN mainframe CAENmainframe.png
The HV board from Naples did not turn on: Yury gave it to the CAEN guys to check and/or bring back for replacement.

Yi and Luigi rented a new HV module (A1519). The HV module (A1520P) we used for tests of the I-V script is also present in the Mainframe (see
below).
Entry  28 Oct 2019 14:56, Simone Stracka, Problem, Software, Issues with network configuration for steering module 
We have tried to connect the steering module to the DAQ pc via Luigi's USB-Ethernet adapter. 

That does not appear to work. We'll receive another USB-Ethernet adapter tomorrow, and it should be configured to have a static IP address
: 192.168.121.1 and NetMask 255.255.255.0
Entry  27 Oct 2019 06:08, Simone Stracka, Configuration, Hardware, Converters installed in VME crate PDMadcCh.pngconverters.jpgadc0_ttl.jpg
People: Edgar, Simone

Installed differential to single-ended converters in VME crate, and turned crate back on. elog:47/2

Channel count in the converters is 0 to 15 starting from the low end. Wired according to:
    Reply  28 Oct 2019 14:10, Ben Smith, Problem Fixed, Software, Converters installed in VME crate 
> V1725 board #0 logic level is set to TTL (boards #1, #2, #3 to NIM) 

There was a problem with CMakeLists for the V1725 driver, and the frontend was only connecting to 1 board. This is now fixed, and all the boards should
Entry  28 Oct 2019 06:28, Simone Stracka, Problem, Software, Need python3 package tkinter on DAQ pc 
We need python3 package tkinter installed on ds-proto-daq in order to run the steering module GUI. 

I don't have root privileges.

 
    Reply  28 Oct 2019 08:33, Ben Smith, Problem Fixed, Software, Need python3 package tkinter on DAQ pc 
I have installed the python3-tkinter package from yum. I checked that "import tkinter" works from a python3 prompt.
Entry  26 Oct 2019 07:33, Sam Hill, Problem, Software, Test of IV Script IV_curve_29K.png
People:  Simone, Sam, Tom, Edgar

Tested IV curve python script that runs using MIDAS. Measured resistance consistant with resistor specification. elog:46/1

The resistance is attached to ch11, and we called the script (channels go from 0 to 24):
Entry  25 Oct 2019 07:44, Simone Stracka, Routine, Hardware, MB2 activities on October 25 TileFEBMapping_MB2.pngiv_warm_1.pngiv_warm_1_zoom.pngIndividualTileAtLNGS.png
Crew: Edgar Sanchez Garcia, Sam Hill, Simone Stracka, Tom Thorpe, Yi Wang

Morning: Set up equipment for the IV curve measurements. We enable the interlock system in the SMU in order to go higher than 42 V (handle with care).
Entry  25 Oct 2019 07:17, Simone Stracka, Routine, Hardware, Photoelectronics activities on October, 24 
Crew: Edgar Sanchez Garcia, Sam Hill, Simone Stracka, Tom Thorpe, Yi Wang

Morning: Tested photocurrents for MB2 on tabletop using SMU and Keithley switching matrix.  All measured between 1-10 microAmps.

Afternoon: Tested PDU mounting procedure with TPC assembled and with the mockup.  No showstoppers. This will be the procedure for installation
Entry  16 Jul 2019 03:53, Marco Rescigno, Routine, General, run 774, scintillation events triggering on all 24 channels and 200 us window PileupEvent.png
Majority of 8, threshold at 1000 ADC count, 24 channels enabled (16 trigger signals)  10 Hz, 200 us window, trigger at 9.5 microseconds.

10 k events recorded.

By direct inspection pileup seems at the 10 % level in the 200 us window.