HW-Time-Slice Firmware-Filter Software vx2740 Steering Module Reports MVM MVM Vexos MVM-Bug listing MVM TRIUMF Local DS Prototype DS Cryogenic For Shifters BCIT-31 ChronoBox Run Operation DS-DAQ
  CERN DS-Proto0 read-only backup, Page 6 of 7  Not logged in ELOG logo
Entry  16 Jul 2019 03:51, Marco Rescigno, Routine, General, run 773, scintillation events triggering on all 24 channels 
Majority of 5, threshold at 1000 ADC count, 24 channels enabled (16 trigger signals)  100 Hz, 30 us window.

38 k events recorded.
Entry  16 Jul 2019 03:17, Marco Rescigno, Routine, General, run 772, scintillation events triggering on all channels 
Majority of 5, threshold at 1000 ADC count, 13 channels enabled (10 trigger signals)  50 Hz, 30 us window.

58 k events recorded.
Entry  16 Jul 2019 02:41, Marco Rescigno, Problem, Trigger, Busy handling 
This morning tried to get some data with Vbias=65 V, which seems better for the SiPM in MB1.

Busy handling still erratic.

At the beginning it seemed to work fine with busy_invert off and busy_enable on.
Entry  16 Jul 2019 02:39, Marco Rescigno, Routine, General, run 771, scintillation events triggering on ch11 and ch12 of board0 
Trigger setup with a threshold of 1500 ADC count wrt to baseline, on just two channels.

This is also to limit the trigger to 50 Hz, since the busy still did not work.

100 K events on disk.
Entry  16 Jul 2019 01:58, Marco Rescigno, Routine, General, Run 766 (Laser)  
Laser Run with Vbias=65 V , new recommended value from PE group

500 k events acquired
Entry  13 Jul 2019 14:50, Marco Rescigno, Routine, General, Long Laser run on disk 
Run 747 , 250 k events

as requested by alessandro 40% post trigger, acquisition window 16 us.

 
Entry  12 Jul 2019 11:34, Marco Rescigno, Routine, General, MB1 test in proto-0 setup/2 Run 718 RMS_run718.gifSPE.gifScintillation.gif
Run 718 has 25 channel readout Board 0 ch 0-15 and Board 0 ch 0-7. 

Laser triggered, some noise, maybe not so bad as is look here.

RMS of baseline is 200 ADC count. Single PE peak is about 100-200 ADC count from baseline.
Entry  12 Jul 2019 07:58, Marco Rescigno, Routine, General, MB1 test in proto-0 setup/day 2 Screenshot_from_2019-07-13_17-45-14.png
Implemented a simple charge integration on the midas display, most of the channels look almost as good as this one.

Nothing on the daq side changed, a part from the DAC value moved to 5000, allowing a slightly greater dynamic range.
Entry  12 Jul 2019 06:01, Marco Rescigno, Routine, General, Run 703 
Run 703 is being writte on disk.

16 channels of board 00. 

Laser trigger at 10 Hz
Entry  12 Jul 2019 02:05, Marco Rescigno, Problem, Trigger, MB1 test in proto-0 setup/1 
Tried to get laser sync signal into chronobox (clkin1 input), apparently all triggers dropped by chronobox

Problem is that the same now happen also with the regular setup where the clkin1 signal is taken by the dual timer.

 
Entry  12 Jul 2019 01:27, Marco Rescigno, Configuration, , MB1 test in proto-0 setup/1 
Changed custom size to 500 (20 us), tested ok run 681
Entry  11 Jul 2019 15:52, Thomas, Routine, Trigger, invert first chronobox busy signal 
The DAQ seems to be ready for tests with proto-0 tomorrow.  

I had to invert the first busy input in order to get chronobox to produce triggers.  I modified the setup script
Entry  02 Jul 2019 18:01, Thomas, Routine, Software, MIDAS running again 
Darkside people seem to be doing some tests at CERN next week.  It looks like they aren't going to use our DAQ (they will I think just use CAEN tools).
 But we took 
opportunity to make TRIUMF DAQ work again.  There was a couple issues
Entry  11 Apr 2019 08:20, Thomas, Routine, Trigger, Missing ZMQ banks 
I have done a couple longer tests of the DAQ setup.  The runs were done with a high trigger rate of ~60Hz, with
the V1725 asserting their busy to throttle the trigger.
Entry  10 Apr 2019 05:40, Thomas, Routine, General, General work - day 3 at CERN 
Several points:

1) Gave a series of tutorial on DAQ to DS people yesterday and today.  Got a bunch of feedback, which I will pass on when I'm back at TRIUMF.
Entry  08 Apr 2019 08:31, Thomas, Routine, General, General work - day 1 at CERN 
Notes on day:

1) Fixed the problem with the network interfaces.  Now the computer boots with the correct network configuration; outside world visible 
Entry  03 Apr 2019 15:31, Thomas, Routine, Software, test of elog 
The last elog didn't go out cleanly.  Modified the elogd.cfg to point to the proxy.  Try again.
Entry  03 Apr 2019 15:11, Thomas, Routine, Software, CERN SSO proxy for ds-proto-daq  
Pierre and I got the CERN proxy setup for the Darkside prototype.

Using your CERN single-sign-on identity, you should be able to login to this page
Entry  28 Mar 2019 02:18, Pierre, Configuration, Trigger, Test 
 
Entry  27 Mar 2019 14:04, Pierre, Configuration, Trigger, Time stamp sync 
The ChronoBox latest FW is loaded. Let tme know if this is what the chronobox should look like in term of registers.

Are we monitoring the PLL Lock Loss  (odb: /DEAP Alarm ?)
ELOG V3.1.4-cb3afcd8