HW-Time-Slice Firmware-Filter Software vx2740 Steering Module Reports MVM MVM Vexos MVM-Bug listing MVM TRIUMF Local DS Prototype DS Cryogenic For Shifters BCIT-31 ChronoBox Run Operation DS-DAQ
  CERN DS-Proto0 read-only backup, Page 1 of 8  Not logged in ELOG logo
Entry  13 Dec 2018 11:02, Thomas, Routine, Hardware, Testing V1725 digitizers 
Entry  09 Jan 2019 12:22, Thomas, Routine, General, V1725 LVDS outputs 
Entry  11 Jan 2019 11:07, Thomas, Routine, Digitizer, Data corruption for ADC channels dsproto_corrupt.gif
Entry  17 Jan 2019 15:47, Thomas, Routine, Hardware, Added raided HD to ds-proto-daq 
Entry  21 Jan 2019 13:05, Thomas, Pierre, Routine, Digitizer, Tests of V1725 baseline and triggering 
Entry  28 Jan 2019 01:44, Thoms, Routine, Software, Added web display of V1725 waveforms 
Entry  07 Feb 2019 17:30, Thomas, Routine, Software, Testing the maximum data throughput 
Entry  05 Mar 2019 10:36, Thomas, Routine, Digitizer, Switched to standard V1725 firmware 
Entry  05 Mar 2019 14:20, Thomas, Routine, Hardware, Installed network card 
Entry  06 Mar 2019 14:16, Thomas, Routine, General, Retested the chronobox trigger logic 
Entry  06 Mar 2019 15:10, Thomas, Pierre, Routine, Trigger, Setup of chronobox 
    Reply  06 Mar 2019 18:19, Bryerton Shaw, Routine, Trigger, Setup of chronobox 
Entry  11 Mar 2019 12:30, Thomas, Routine, Trigger, New chronobox firmware; run start/stop implemented 
    Reply  11 Mar 2019 15:27, Thomas, Routine, Trigger, New chronobox firmware; run start/stop implemented 
Entry  03 Apr 2019 15:11, Thomas, Routine, Software, CERN SSO proxy for ds-proto-daq  
Entry  03 Apr 2019 15:31, Thomas, Routine, Software, test of elog 
Entry  08 Apr 2019 08:31, Thomas, Routine, General, General work - day 1 at CERN 
Entry  10 Apr 2019 05:40, Thomas, Routine, General, General work - day 3 at CERN 
Entry  11 Apr 2019 08:20, Thomas, Routine, Trigger, Missing ZMQ banks 
Entry  02 Jul 2019 18:01, Thomas, Routine, Software, MIDAS running again 
ELOG V3.1.4-cb3afcd8