Entry  18 Nov 2019 02:04, Yi Wang, Procedure/Operation, Cooling System, Open dewar refill 
9:00 am open dewar refilled to full, TPC pressure 30 mbar
Entry  17 Nov 2019 00:45, Yi Wang, Procedure/Operation, Cooling System, open dewar refill 
09:45 am open dewar refill to full, TPC pressure 31 mbar
Entry  16 Nov 2019 00:12, Yi Wang, Procedure/Operation, Cooling System, Gas pocket formation 
09:12 am MB OFF, LED ON, start forming gas pocket

10:46 am Gas pocket 7mm thick, LED OFF, MB ON
Entry  15 Nov 2019 23:54, Yi Wang, Procedure/Operation, Cooling System, open dewar refill 
08:50 am open dewar refill to full
Entry  15 Nov 2019 00:14, Yi Wang, Procedure/Operation, Cooling System,  
Nov 14, 2019

5:00 pm

Stop fast recirculation, fill open dewar to full
Entry  14 Nov 2019 00:34, E. Sanchez, Procedure/Operation, General,  
9:20 TPC pressure  235 mbar recirculation  pressure 235 mbar. Gas pocket on. LED OFF. MB ON.  LAr level  50 cm 

10:20 TPC pressure  240 mbar recirculation 240 mbar

10:34 Heat gun ON
Entry  13 Nov 2019 05:32, Xiang Xiao, Procedure/Operation, Cooling System, Afternoon system monitoring 
14:31 TPC pressure 317 mbar, recirculation pressure 276 mbar

15:00 TPC pressure 328 mbar, recirculation pressure 285 mbar

15:31 TPC pressure 348 mbar, recirculation pressure 305 mbar
Entry  13 Nov 2019 00:26, Yi Wang, Procedure/Operation, Cooling System, Morning system monitoring 
09:30 Heat Gun ON

09:40 TPC pressure 293 mbar, recirculation pressure 277 mbar

10:20 open dewar refill to 70/120 cm
Entry  12 Nov 2019 05:47, Edgar Sanchez, Procedure/Operation, General, Afternoon system monitoring  
14:47 TPC pressure 330 mbar Recirculation pressure: 290 mbar 

15:35 TPC pressure 345 mbar Recirculation pressure: 300 mbar 

16:35 TPC pressure 440 mbar Recirculation pressure: 400 mbar 
Entry  12 Nov 2019 00:48, Yi Wang, Procedure/Operation, Cooling System, morning system monitoring 
09:47 Heat gun ON, TPC pressure 261 mbar, recirculation pressure 252 mbar

11:00 Building 182 liquid argon tower refiiled

11:20 Refill open dewar to 70/120 cm
Entry  11 Nov 2019 10:15, Sam Hill, Procedure/Operation, Cooling System, Afternoon system monitoring 
Checked pressure regularly, steadily climbed from 15:00-19:00 

19:00: TPC: 461 mbar   Recirculation 397 mbar

19:23: Dewar Level 40cm
Entry  11 Nov 2019 04:08, Yi Wang, Problem, Cooling System, Possible power blackout on Nov 9 
There was a possible power blackout on Nov 9 from 2 am to 4 am at builidng 182.

During the blackout, the vacuum pump for pumping the insulation vacuum of the cryogenic system was OFF.

Moistures were accumulated in the interlayer during these two hours, and now the vacuum insulation is not as good as before.
Entry  11 Nov 2019 00:39, Yi Wang, Procedure/Operation, Cooling System, Morning system monitoring 
09:39 heat gun on

12:37 TPC pressure 350 mbar, recirculation pressure 338 mbar

13:50 TPC pressure 336 mbar, recirculation pressure 315 mbar
Entry  10 Nov 2019 05:34, Edgar Sanchez, Procedure/Operation, Cooling System, Afternoon system monitoring  
14:34 TPC pressure 300 mbar , recirculation pressure 287 mbar 

15:00 Heaters off for S1 data taking 

15:30 TPC pressure 350 mbar , recirculation pressure 340 mbar 
Entry  10 Nov 2019 00:25, Yi Wang, Procedure/Operation, Cooling System, Morning system monitoring 
09:25 Heat gun ON

09:40 TPC pressure 241 mbar, recirculation pressure 231 mbar

10:45 TPC pressure 327 mbar, recirculation pressure 301 mbar
Entry  09 Nov 2019 06:35, Sam Hill, Procedure/Operation, Cooling System, Afternoon system monitoring 
15:36 TPC 320 mbar Recirculation 320 mbar

16:01 TPC 313 mbar Recirculation 313 mbar

16:31 TPC 235 mbar Recirculation 225 mbar
Entry  09 Nov 2019 01:37, Xiang Xiao, Procedure/Operation, Cooling System, Morning system monitoring 
10:20 Heater gun on

10:20 TPC 230 mbar Recirculation 241 mbar

10:59 TPC 391 mbar Recirculation 345 mbar
Entry  08 Nov 2019 05:39, Edgar Sanchez, Procedure/Operation, Cooling System, Afternoon system monitoring  
14:00 TPC 330 mbar Recirculation 290 mbar. Liquid argon level in bath 65 cm 

15:00 TPC 335 mbar Recirculation 300 mbar. 

16:11 TPC 373 mbar Recirculation 333 mbar. 
Entry  08 Nov 2019 00:28, Yi Wang, Procedure/Operation, Cooling System, Morning system monitoring 
09:29 Heat Gun ON

09:30 TPC 259 mbar Recirculation 257 mbar

10:03 TPC 382 mbar Recirculation 326 mbar
Entry  07 Nov 2019 05:19, Yi Wang, Procedure/Operation, Cooling System, fast recirculation 
08:40, switch on heat gun, open dewar liquid level 50/120 (cm)

16:30, open dewar is refilled to 70/120 (cm)

21:40, switch off heat gun, open dewar liquid level 60/120 (cm)