HW-Time-Slice Firmware-Filter Software vx2740 Steering Module Reports MVM MVM Vexos MVM-Bug listing MVM TRIUMF Local DS Prototype DS Cryogenic For Shifters BCIT-31 ChronoBox Run Operation DS-DAQ
  CERN DS-Proto0 read-only backup  Not logged in ELOG logo
Message ID: 24     Entry time: 18 Nov 2019 02:04
Author: Yi Wang 
Type: Procedure/Operation 
Category: Cooling System 
Subject: Open dewar refill 

9:00 am open dewar refilled to full, TPC pressure 30 mbar

ELOG V3.1.4-cb3afcd8