HW-Time-Slice Firmware-Filter Software vx2740 Steering Module Reports MVM MVM Vexos MVM-Bug listing MVM TRIUMF Local DS Prototype DS Cryogenic For Shifters BCIT-31 ChronoBox Run Operation DS-DAQ
  CERN DS-Proto0 read-only backup  Not logged in ELOG logo
Message ID: 14     Entry time: 11 Nov 2019 10:15
Author: Sam Hill 
Type: Procedure/Operation 
Category: Cooling System 
Subject: Afternoon system monitoring 

Checked pressure regularly, steadily climbed from 15:00-19:00

19:00: TPC: 461 mbar   Recirculation 397 mbar

19:23: Dewar Level 40cm

19:23: Refill open dewar

19:33: Dewar leve 60cm, TPC pressure 201 mbar Recirculation pressure 201 mbar

ELOG V3.1.4-cb3afcd8