HW-Time-Slice Firmware-Filter Software vx2740 Steering Module Reports MVM MVM Vexos MVM-Bug listing MVM TRIUMF Local DS Prototype DS Cryogenic For Shifters BCIT-31 ChronoBox Run Operation DS-DAQ
  CERN DS-Proto0 read-only backup  Not logged in ELOG logo
Message ID: 18     Entry time: 13 Nov 2019 05:32
Author: Xiang Xiao 
Type: Procedure/Operation 
Category: Cooling System 
Subject: Afternoon system monitoring 

14:31 TPC pressure 317 mbar, recirculation pressure 276 mbar

15:00 TPC pressure 328 mbar, recirculation pressure 285 mbar

15:31 TPC pressure 348 mbar, recirculation pressure 305 mbar

15:58 TPC pressure 346 mbar, recirculation pressure 297 mbar

16:29 TPC pressure 344 mbar, recirculation pressure 294 mbar

17:01 TPC pressure 359 mbar, recirculation pressure 303 mbar

17:13 Heat gun off, MB off, LED on, Gas bubble exists

17:18 Start refilling condenser

17:32 Stop refilling condenser, TPC pressure 274 mbar, recirculation pressure 260 mbar

18:05 TPC pressure 256 mbar, recirculation pressure 237 mbar

18:13 LED off, MB on

18:30 TPC pressure 257  mbar, recirculation pressure 206 mbar

18:52 TPC pressure 256 mbar, recirculation pressure 257 mbar

 

ELOG V3.1.4-cb3afcd8