HW-Time-Slice Firmware-Filter Software vx2740 Steering Module Reports MVM MVM Vexos MVM-Bug listing MVM TRIUMF Local DS Prototype DS Cryogenic For Shifters BCIT-31 ChronoBox Run Operation DS-DAQ
  CERN DS-Proto0 read-only backup  Not logged in ELOG logo
Message ID: 16     Entry time: 12 Nov 2019 05:47
Author: Edgar Sanchez 
Type: Procedure/Operation 
Category: General 
Subject: Afternoon system monitoring  

14:47 TPC pressure 330 mbar Recirculation pressure: 290 mbar 

15:35 TPC pressure 345 mbar Recirculation pressure: 300 mbar 

16:35 TPC pressure 440 mbar Recirculation pressure: 400 mbar 

16:43 Heat gun off 

18:04  TPC pressure 230 mbar Recirculation pressure: 230 mbar 

18:55  TPC pressure 250 mbar Recirculation pressure: 250 mbar 

Bubbler 8.4 V 5.1 mA 

LAr bath level 55 cm 

MB OFF 

LED ON 

ELOG V3.1.4-cb3afcd8