HW-Time-Slice Firmware-Filter Software vx2740 Steering Module Reports MVM MVM Vexos MVM-Bug listing MVM TRIUMF Local DS Prototype DS Cryogenic For Shifters BCIT-31 ChronoBox Run Operation DS-DAQ
  CERN DS-Proto0 read-only backup  Not logged in ELOG logo
Message ID: 15     Entry time: 12 Nov 2019 00:48
Author: Yi Wang 
Type: Procedure/Operation 
Category: Cooling System 
Subject: morning system monitoring 

09:47 Heat gun ON, TPC pressure 261 mbar, recirculation pressure 252 mbar

11:00 Building 182 liquid argon tower refiiled

11:20 Refill open dewar to 70/120 cm

11:36 TPC pressure 218 mbar, recirculation pressure 214 mbar

ELOG V3.1.4-cb3afcd8