HW-Time-Slice Firmware-Filter Software vx2740 Steering Module Reports MVM MVM Vexos MVM-Bug listing MVM TRIUMF Local DS Prototype DS Cryogenic For Shifters BCIT-31 ChronoBox Run Operation DS-DAQ
  CERN DS-Proto0 read-only backup  Not logged in ELOG logo
Message ID: 10     Entry time: 10 Nov 2019 00:25
Author: Yi Wang 
Type: Procedure/Operation 
Category: Cooling System 
Subject: Morning system monitoring 

09:25 Heat gun ON

09:40 TPC pressure 241 mbar, recirculation pressure 231 mbar

10:45 TPC pressure 327 mbar, recirculation pressure 301 mbar

11:34 TPC pressure 318 mbar, recirculation pressure 289 mbar

12:08 TPC pressure 322 mbar, recirculation pressure 286 mbar

13:54 TPC pressure 300 mbar, recirculation pressure 288 mbar

ELOG V3.1.4-cb3afcd8