HW-Time-Slice Firmware-Filter Software vx2740 Steering Module Reports MVM MVM Vexos MVM-Bug listing MVM TRIUMF Local DS Prototype DS Cryogenic For Shifters BCIT-31 ChronoBox Run Operation DS-DAQ
  CERN DS-Proto0 read-only backup  Not logged in ELOG logo
Message ID: 17     Entry time: 13 Nov 2019 00:26
Author: Yi Wang 
Type: Procedure/Operation 
Category: Cooling System 
Subject: Morning system monitoring 

09:30 Heat Gun ON

09:40 TPC pressure 293 mbar, recirculation pressure 277 mbar

10:20 open dewar refill to 70/120 cm

10:24 TPC pressure 264 mbar, recirculation pressure 241 mbar

13:40 TPC pressure 313 mbar, recirculation pressure 284 mbar

ELOG V3.1.4-cb3afcd8