HW-Time-Slice Firmware-Filter Software vx2740 Steering Module Reports MVM MVM Vexos MVM-Bug listing MVM TRIUMF Local DS Prototype DS Cryogenic For Shifters BCIT-31 ChronoBox Run Operation DS-DAQ
  CERN DS-Proto0 read-only backup, Page 3 of 8  Not logged in ELOG logo
Entry  14 Nov 2019 00:09, Ben Smith, Problem, Hardware, Chronobox not serving human webpage 
Entry  14 Nov 2019 08:14, Ben Smith, Routine, General, Automatic copying to darkside01 
    Reply  18 Nov 2019 07:20, Ben Smith, Routine, General, Disk cleanup 
Entry  16 Mar 2020 14:21, Ben Smith, Configuration, Software, New CAEN HV frontend 
Entry  08 Sep 2020 12:46, Ben Smith, Configuration, Other, New backup ELOG location 
    Reply  06 Mar 2019 18:19, Bryerton Shaw, Routine, Trigger, Setup of chronobox 
Entry  10 Nov 2019 12:15, E. Sanchez, Problem, MIDAS, Problem DAQ 
Entry  14 Nov 2019 00:33, E. Sanchez, Routine, General, Morning data taking 
Entry  14 Nov 2019 03:51, E. Sanchez, Routine, General, S1 data taking without field 
Entry  14 Nov 2019 07:42, E. Sanchez, Routine, General, S1 data taking with field 
Entry  15 Nov 2019 10:48, E. Sanchez, Routine, General, S1 data taking proposed by Marco 
Entry  08 Nov 2019 10:07, Edgar Sanchez, Routine, General, Monitoring Data Taking 
Entry  10 Nov 2019 08:04, Edgar Sanchez, Routine, General, S1 data taking with field 
Entry  10 Nov 2019 08:40, Edgar Sanchez, Routine, General, S1 data taking without field 
Entry  10 Nov 2019 11:18, Edgar Sanchez, Routine, General, Afternoon system monitoring  
Entry  10 Nov 2019 11:19, Edgar Sanchez, Routine, General, S1 + S2 short time window  
Entry  12 Nov 2019 09:22, Edgar Sanchez, Routine, General, Afternoon system monitoring  
Entry  12 Nov 2019 09:30, Edgar Sanchez, Routine, General, Afternoon system monitoring  
Entry  12 Nov 2019 10:08, Edgar Sanchez, Routine, General, Laser run 
Entry  18 Nov 2019 07:01, Julie / Edgar, Routine, General, Random Trigger runs suggested by Simone, S1 data 
ELOG V3.1.4-cb3afcd8