HW-Time-Slice Firmware-Filter Software vx2740 Steering Module Reports MVM MVM Vexos MVM-Bug listing MVM TRIUMF Local DS Prototype DS Cryogenic For Shifters BCIT-31 ChronoBox Run Operation DS-DAQ
  CERN DS-Proto0 read-only backup  Not logged in ELOG logo
Message ID: 122     Entry time: 12 Nov 2019 09:22
Author: Edgar Sanchez 
Type: Routine 
Category: General 
Subject: Afternoon system monitoring  

Run 1090

Gas pocket: ON (thinkness 7mm)

Fields: drift 200 V/cm, extraction 3.78 kV/cm

Threshold: 1000 ADCc below baseline

Trace length: 100us total, 50 us pre-trigger

Threshold extend:  5x16 = 80ns

TPC Pressure:  220 mbarg

SiPM HV: 65 V

Number of events: 10k

Run 1091

Gas pocket: ON (thinkness 7mm)

Fields: drift 200 V/cm, extraction 3.78 kV/cm

Threshold: 400 ADCc below baseline

Trace length: 100us total, 50 us pre-trigger

Threshold extend:  5x16 = 80ns

TPC Pressure:  220 mbarg

SiPM HV: 65 V

Number of events: 10k

ELOG V3.1.4-cb3afcd8