HW-Time-Slice Firmware-Filter Software vx2740 Steering Module Reports MVM MVM Vexos MVM-Bug listing MVM TRIUMF Local DS Prototype DS Cryogenic For Shifters BCIT-31 ChronoBox Run Operation DS-DAQ
  CERN DS-Proto0 read-only backup, Page 4 of 8  Not logged in ELOG logo
Entry  11 Nov 2019 09:31, Sam Hill, Routine, General, Afternoon system monitoring: IV curves and Dewar refill summaryPlot_191111.png
Entry  11 Nov 2019 10:05, Sam Hill, Problem, General, Evening data taking 
Entry  12 Nov 2019 00:24, Yi Wang, Routine, General, Morning data taking 
Entry  12 Nov 2019 09:22, Edgar Sanchez, Routine, General, Afternoon system monitoring  
Entry  12 Nov 2019 09:30, Edgar Sanchez, Routine, General, Afternoon system monitoring  
Entry  12 Nov 2019 10:08, Edgar Sanchez, Routine, General, Laser run 
Entry  13 Nov 2019 00:08, Yi Wang, Routine, General, Morning data taking 
Entry  13 Nov 2019 09:24, Xiang Xiao, Routine, General, Evening data taking 
Entry  14 Nov 2019 00:33, E. Sanchez, Routine, General, Morning data taking 
Entry  14 Nov 2019 03:51, E. Sanchez, Routine, General, S1 data taking without field 
Entry  14 Nov 2019 04:03, Yi/Edgar/Sam, Routine, General, Noise data taking 
Entry  14 Nov 2019 07:42, E. Sanchez, Routine, General, S1 data taking with field 
Entry  14 Nov 2019 08:14, Ben Smith, Routine, General, Automatic copying to darkside01 
Entry  15 Nov 2019 00:19, Yi Wang, Routine, General, Laser run 
Entry  15 Nov 2019 10:48, E. Sanchez, Routine, General, S1 data taking proposed by Marco 
Entry  16 Nov 2019 01:57, Yi Wang, Routine, General, Dual phase data taking proposed by Marco 
Entry  17 Nov 2019 00:48, Yi Wang, Routine, General, dual phase data taking Screenshot_from_2019-11-17_11-02-26.png
Entry  17 Nov 2019 02:23, Yi Wang, Routine, General, dual phase data taking 
Entry  18 Nov 2019 00:18, Yi / Edgar, Routine, General, dual phase data taking 
Entry  18 Nov 2019 02:40, Pascal/Julie, Routine, General, Laser run 
ELOG V3.1.4-cb3afcd8