HW-Time-Slice Firmware-Filter Software vx2740 Steering Module Reports MVM MVM Vexos MVM-Bug listing MVM TRIUMF Local DS Prototype DS Cryogenic For Shifters BCIT-31 ChronoBox Run Operation DS-DAQ
  CERN DS-Proto0 read-only backup  Not logged in ELOG logo
Message ID: 137     Entry time: 17 Nov 2019 00:48
Author: Yi Wang 
Type: Routine 
Category: General 
Subject: dual phase data taking 

Run 1197

Gas pocket: ON (thinkness 7mm)

Fields: drift 200 V/cm, extraction 2.8 kV/cm

Threshold: 200 ADCc below baseline

Coincidence: 3

Trace length: 100us total, 50 us pre-trigger

Threshold extend:  5x16 = 80ns

TPC Pressure:  30 mbarg

SiPM HV: 65 V

Number of events: 20k

 

Run 1198

Gas pocket: ON (thinkness 7mm)

Fields: drift 200 V/cm, extraction 2.8 kV/cm

Threshold: 500 ADCc below baseline

Coincidence: 3

Trace length: 100us total, 50 us pre-trigger

Threshold extend:  5x16 = 80ns

TPC Pressure:  30 mbarg

SiPM HV: 65 V

Number of events: 20k

 

Run 1200

Gas pocket: ON (thinkness 7mm)

Fields: drift 200 V/cm, extraction 3.78 kV/cm

Threshold: 200 ADCc below baseline

Coincidence: 3

Trace length: 100us total, 50 us pre-trigger

Threshold extend:  5x16 = 80ns

TPC Pressure:  30 mbarg

SiPM HV: 65 V

Number of events: 20k

 

Run 1201

Gas pocket: ON (thinkness 7mm)

Fields: drift 200 V/cm, extraction 3.78 kV/cm

Threshold: 500 ADCc below baseline

Coincidence: 3

Trace length: 100us total, 50 us pre-trigger

Threshold extend:  5x16 = 80ns

TPC Pressure:  30 mbarg

SiPM HV: 65 V

Number of events: 20k

Data taking has to be stopped because of the noises.

 

Attachment 1: Screenshot_from_2019-11-17_11-02-26.png  111 kB  Uploaded 17 Nov 2019 11:03  | Hide | Hide all
Screenshot_from_2019-11-17_11-02-26.png
ELOG V3.1.4-cb3afcd8