  1   11 Dec 2018 15:17 ThomasConfigurationSoftwareSetup elog for ds-proto-daq
1) Install and tweak elog:
  
  2   11 Dec 2018 15:20 ThomasConfigurationSoftwareSetup elog for ds-proto-daq
1) Install and tweak elog:
  
  9   31 Jan 2019 15:18 PierreConfigurationTriggerTrigger rateSomehow the trigger rate was not matching
the trigger source.
Find out that Link 3 was not collecting and
  
  10   06 Feb 2019 14:12 PierreConfigurationHardwareExtended Trigger Time Tag (ETTT)Confirmed this ETTT configuration is working.

                     ETTT Enabled [22..21]
  
  14   19 Feb 2019 16:26 Pierre-A.ConfigurationGeneralOverall HW configurationFor Reference,

I put a simple schematic for the
Trigger/Run control.
 ds-proto-architecture-02.pdf 
  22   27 Mar 2019 08:57 PierreConfigurationHardwareCERN setupFound that the Trigger out from the CB is
on output1
Trigger / Not used
  
  23   27 Mar 2019 14:04 PierreConfigurationTriggerTime stamp syncThe ChronoBox latest FW is loaded. Let tme
know if this is what the chronobox should
look like in term of registers.
  
  24   28 Mar 2019 02:18 PierreConfigurationTriggerTest    
  32   12 Jul 2019 01:27 Marco RescignoConfiguration MB1 test in proto-0 setup/1Changed custom size to 500 (20 us), tested
ok run 681
  
  47   27 Oct 2019 06:08 Simone StrackaConfigurationHardwareConverters installed in VME cratePeople: Edgar, Simone

Installed differential to single-ended
converters in VME crate, and turned crate
 PDMadcCh.pngconverters.jpgadc0_ttl.jpg 
  52   28 Oct 2019 15:10 Simone StrackaConfigurationHardwareLV for steering module and current status of CAEN mainframeThe HV board from Naples did not turn on:
Yury gave it to the CAEN guys to check and/or
bring back for replacement.
 CAENmainframe.png 
  55   01 Nov 2019 06:50 Alex KishConfigurationHardwareTurn off the fieldsRamp down the fields, in 200V steps.
Nominal values:
1st ring: 4180 V
  
  58   01 Nov 2019 09:49 Alex KishConfigurationHardwareTurn off the fieldsRamp UP the fields, in 100V steps.

Nominal values:
  
  65   04 Nov 2019 06:02 Alex KishConfigurationHardwareIncreased fields!Increased drift and extraction fields.

Current settings: wire gate 5100 V, 1st ring:
  
  66   04 Nov 2019 07:57 Ben SmithConfigurationSoftwarePackage installationsThis morning I installed the xrootd-client
and python3-devel packages from yum. For
the latter to work, I needed to do a yum
  
  67   04 Nov 2019 08:00 Ben SmithConfigurationMIDASChange of location of history files/home was getting very full on ds-proto-daq,
so I moved the history files onto the /data
disk. There is now a symlink from ~/online/history
  
  70   05 Nov 2019 01:22 Ben SmithConfigurationDigitizerV1725 board configThe V1725s have been changed to have board
config 0x50 rather than 0x10. This means
that they will now trigger on the leading
  
  87   06 Nov 2019 05:58 Ben SmithConfigurationHardwareCAEN VME Crate DHCPThe CAEN VME crate now gets its IP address
from the ds-proto-daq DHCP server. To do
this, I set the IP address of the crate to
  
  97   08 Nov 2019 02:48 Ben SmithConfigurationMIDASEnabled dotfile naming in LoggerI have changed `/Logger/Channels/0/Settings/Filename`
to start with a dot, so files will be hidden
until they are complete. 
  
  98   08 Nov 2019 05:14 Ben SmithConfigurationHardwareAdding darkside01 to the networkThe analysis server from Roma (darkside01)
is now connected to the local network. It
is not yet connected to CERN.
  