HW-Time-Slice Firmware-Filter Software vx2740 Steering Module Reports MVM MVM Vexos MVM-Bug listing MVM TRIUMF Local DS Prototype DS Cryogenic For Shifters BCIT-31 ChronoBox Run Operation DS-DAQ
  CERN DS-Proto0 read-only backup, Page 2 of 2  Not logged in ELOG logo
ID Date Author Typedown Category Subject Text Attachments
  23   17 Nov 2019 00:45 Yi WangProcedure/OperationCooling Systemopen dewar refill09:45 am open dewar refill to full, TPC
pressure 31 mbar
  
  24   18 Nov 2019 02:04 Yi WangProcedure/OperationCooling SystemOpen dewar refill9:00 am open dewar refilled to full, TPC
pressure 30 mbar
  
  13   11 Nov 2019 04:08 Yi WangProblemCooling SystemPossible power blackout on Nov 9There was a possible power blackout on
Nov 9 from 2 am to 4 am at builidng 182.

During the blackout, the vacuum
  
ELOG V3.1.4-cb3afcd8