HW-Time-Slice Firmware-Filter Software vx2740 Steering Module Reports MVM MVM Vexos MVM-Bug listing MVM TRIUMF Local DS Prototype DS Cryogenic For Shifters BCIT-31 ChronoBox Run Operation DS-DAQ
  CERN DS-Proto0 read-only backup  Not logged in ELOG logo
Message ID: 4     Entry time: 06 Nov 2019 00:33
Author: Yi Wang 
Type: Procedure/Operation 
Category: Cooling System 
Subject: fast re-circulation  

Start at 09:35 am, open dewar liquid level 40/120

Stop at 08:20 pm, for the evening data taking

ELOG V3.1.4-cb3afcd8