HW-Time-Slice Firmware-Filter Software vx2740 Steering Module Reports MVM MVM Vexos MVM-Bug listing MVM TRIUMF Local DS Prototype DS Cryogenic For Shifters BCIT-31 ChronoBox Run Operation DS-DAQ
  CERN DS-Proto0 read-only backup, Page 1 of 8  Not logged in ELOG logo
ID Date Author Type Categorydown Subject Text Attachments
  9   31 Jan 2019 15:18 PierreConfigurationTriggerTrigger rateSomehow the trigger rate was not matching
the trigger source.
Find out that Link 3 was not collecting and
  
  18   06 Mar 2019 15:10 Thomas, PierreRoutineTriggerSetup of chronoboxSummary of setup of chronobox on network (mostly
done by Pierre):
  
  19   06 Mar 2019 18:19 Bryerton ShawRoutineTriggerSetup of chronoboxThe SDcard is currently required for operation
of the device, the ext3/4 filesystem will
immediately fail upon removal.
  
  20   11 Mar 2019 12:30 ThomasRoutineTriggerNew chronobox firmware; run start/stop implementeda) Bryerton implemented new version of the
firmware.  New features:
  
  21   11 Mar 2019 15:27 ThomasRoutineTriggerNew chronobox firmware; run start/stop implemented
> f) However, I found that the frontend program
still consistently failed with this error
  
  23   27 Mar 2019 14:04 PierreConfigurationTriggerTime stamp syncThe ChronoBox latest FW is loaded. Let tme
know if this is what the chronobox should
look like in term of registers.
  
  24   28 Mar 2019 02:18 PierreConfigurationTriggerTest    
  29   11 Apr 2019 08:20 ThomasRoutineTriggerMissing ZMQ banksI have done a couple longer tests of the DAQ
setup.  The runs were done with a high trigger
rate of ~60Hz, with
  
  31   11 Jul 2019 15:52 ThomasRoutineTriggerinvert first chronobox busy signalThe DAQ seems to be ready for tests with proto-0
tomorrow.  
  
  33   12 Jul 2019 02:05 Marco RescignoProblemTriggerMB1 test in proto-0 setup/1Tried to get laser sync signal into chronobox
(clkin1 input), apparently all triggers dropped
by chronobox
  
  40   16 Jul 2019 02:41 Marco RescignoProblemTriggerBusy handlingThis morning tried to get some data with
Vbias=65 V, which seems better for the SiPM
in MB1.
  
  118   11 Nov 2019 23:57 Yi WangProblem FixedTriggerID 117 problem is fixedThe problem reported in ID 117 is somehow
fixed this morning.
  
  1   11 Dec 2018 15:17 ThomasConfigurationSoftwareSetup elog for ds-proto-daq
1) Install and tweak elog:
  
  2   11 Dec 2018 15:20 ThomasConfigurationSoftwareSetup elog for ds-proto-daq
1) Install and tweak elog:
  
  8   28 Jan 2019 01:44 ThomsRoutineSoftwareAdded web display of V1725 waveformsI added javascript webdisplay of the V1725
waveforms to the Darkside setup.  You can
see the waveform display here:
  
  11   07 Feb 2019 17:30 ThomasRoutineSoftwareTesting the maximum data throughputFirst check the maximum trigger rate and maximum
data rate for different sample lengths (for
each channels):
  
  25   03 Apr 2019 15:11 ThomasRoutineSoftwareCERN SSO proxy for ds-proto-daq Pierre and I got the CERN proxy setup for
the Darkside prototype.
  
  26   03 Apr 2019 15:31 ThomasRoutineSoftwaretest of elogThe last elog didn't go out cleanly.  Modified
the elogd.cfg to point to the proxy.  Try
again.
  
  30   02 Jul 2019 18:01 ThomasRoutineSoftwareMIDAS running againDarkside people seem to be doing some tests
at CERN next week.  It looks like they aren't
going to use our DAQ (they will I think just
  
  46   26 Oct 2019 07:33 Sam HillProblemSoftwareTest of IV ScriptPeople:  Simone, Sam, Tom, Edgar

Tested IV curve python script that
runs using MIDAS. Measured resistance consistant
 IV_curve_29K.png 
ELOG V3.1.4-cb3afcd8