HW-Time-Slice
Firmware-Filter
Software
vx2740
Steering Module
Reports
MVM
MVM Vexos
MVM-Bug listing
MVM TRIUMF Local
DS Prototype
DS Cryogenic
For Shifters
BCIT-31
ChronoBox
Run Operation
DS-DAQ
CERN DS-Proto0 read-only backup, Page 2 of 2
Not logged in
Find
|
Config
|
Help
Full
| Summary |
Threaded
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
-- Type --
Routine
Other
23 Entries
Goto page
Previous
1
, 2
All
ID
Date
Author
Type
Category
Subject
Text
4
06 Nov 2019 00:33
Yi Wang
Procedure/Operation
Cooling System
fast re-circulation
Start at 09:35 am, open dewar liquid level
40/120
Stop at 08:20 pm, for the evening
3
05 Nov 2019 10:56
Yi Wang
Procedure/Operation
Cooling System
fast re-circulation
Nov 04 in the morning, start using
heat gun to blow the liquid argon in the
open dewar, in order to rise the pressure
2
02 Nov 2019 11:44
Alex Kish
Procedure/Operation
Cooling System
Forcing recirculation
Argon refills of the open bath are suspended
in order to increase the deltaP between the
TPC and the recirculation vessel, in order
Goto page
Previous
1
, 2
All
ELOG V3.1.4-cb3afcd8